A, B and C can do a piece of work in 12 days, 15 days and 16 days,…

2026

A, B and C can do a piece of work in 12 days, 15 days and 16 days, respectively. If A, B and C work together, then how many days will they take to complete the work?

Answer: D. 4 12/17 daysConceptWhen people work independently on the same job, their work rates add. If the combined rate is R jobs per day, the completion time is 1/R days.…

  1. A.

    3 14/15 days

  2. B.

    3 11/19 days

  3. C.

    2 10/13 days

  4. D.

    4 12/17 days

Attempted by 25 students.

Show answer & explanation

Correct answer: D

Concept

When people work independently on the same job, their work rates add. If the combined rate is R jobs per day, the completion time is 1/R days.

Application

  1. A, B and C complete 1/12, 1/15 and 1/16 of the work per day, respectively.

  2. Using 240 as the common denominator, the combined rate is 20/240 + 16/240 + 15/240 = 51/240 = 17/80 of the work per day.

  3. Therefore, the required time is 1 ÷ (17/80) = 80/17 = 4 12/17 days.

Cross-check

Multiplying the combined rate by the computed time gives (17/80) × (80/17) = 1 complete job.

Thus, A, B and C together complete the work in 4 12/17 days.