A can complete a piece of work in 10 days, while B can complete the same work…

2026

A can complete a piece of work in 10 days, while B can complete the same work in 12 days. If they work together, how many days will they take to complete one-eighth of the work?

Answer: C. 15/22 daysConceptIf a person completes one whole job in d days, that person’s work rate is 1/d of the job per day. For people working together, add their rates. The…

  1. A.

    12/17 days

  2. B.

    14/19 days

  3. C.

    15/22 days

  4. D.

    11/14 days

Attempted by 47 students.

Show answer & explanation

Correct answer: C

Concept

If a person completes one whole job in d days, that person’s work rate is 1/d of the job per day.

For people working together, add their rates. The time for a required fraction of the job equals that fraction divided by the combined rate.

Application

  1. A’s rate is 1/10 of the work per day, and B’s rate is 1/12 of the work per day.

  2. Their combined rate is 1/10 + 1/12 = 6/60 + 5/60 = 11/60 of the work per day.

  3. Let t be the number of days needed for 1/8 of the work. Then (11/60)t = 1/8.

  4. Therefore, t = (1/8) ÷ (11/60) = (1/8) × (60/11) = 15/22 day.

Cross-check

In 15/22 day, the completed work is (11/60) × (15/22) = 1/8, so the required fraction is obtained.

Result

Thus, they will take 15/22 day.

Explore the full course: Uptet Paper 1

Loading lesson…