Process Scheduler Type Activity (i) Long Term Scheduler (P) executes much…
ISRO Scientist/Engineer SC · 2023 · Computer Science · Part A · Discipline
| Process Scheduler Type |
| Activity |
(i) | Long Term Scheduler | (P) | executes much faster to reduce wastage of CPU time |
(ii) | Medium term scheduler | (Q) | controls degree of multi programming |
(iii) | Short Term scheduler | (R) | is associated with swapping |
with respect to Process Schedulers of an operating system mentioned above in the table, which of the following statements is correct?
- A.
(i) – (R), (ii) – (P), (iii) – (Q)
- B.
(i) – (Q), (ii) – (R), (iii) – (P)
- C.
(i) – (P), (ii) – (R), (iii) – (Q)
- D.
(i) – (R), (ii) – (Q), (iii) – (P)
Attempted by 1205 students.
Show answer
Correct answer: B
Explore the full course: Iocl Engineers Officers Grade A Paper 2
Loading lesson…