Let S be a stack of size n ≥ 1. Starting with the empty stack, suppose we push…
GATE · 2003 · CS
Let S be a stack of size n ≥ 1. Starting with the empty stack, suppose we push the first n natural numbers in sequence, and then perform n pop operations. Assume that Push and pop operation take X seconds each, and Y seconds elapse between the end of one such stack operation and the start of the next operation. For m ≥ 1, define the stack-life of m as the time elapsed from the end of Push(m) to the start of the pop operation that removes m from S. The average stack-life of an element of this stack is
- A.
n (X + Y)
- B.
3Y + 2X
- C.
n (X + Y) - X
- D.
Y + 2X
Attempted by 585 students.
Show answer
Correct answer: C
Explore the full course: Iocl Engineers Officers Grade A Paper 2
Loading lesson…