Rakesh can complete a piece of work in 6 hours, while Shivam can complete it…

2026

Rakesh can complete a piece of work in 6 hours, while Shivam can complete it in 14 hours. With Rupesh assisting them, all three complete the work in 3 hours. How many hours would Rupesh alone take to complete twice that amount of work?

Answer: C. 21ConceptFor work-rate problems, a worker who completes one job in t hours has rate 1/t job per hour. Rates add when people work together, and time equals…

  1. A.

    20

  2. B.

    22

  3. C.

    21

  4. D.

    23

Attempted by 24 students.

Show answer & explanation

Correct answer: C

Concept

For work-rate problems, a worker who completes one job in t hours has rate 1/t job per hour.

Rates add when people work together, and time equals required work divided by the relevant rate.

Application

  1. Rakesh’s rate is 1/6 job per hour, and Shivam’s rate is 1/14 job per hour.

  2. Their combined rate is 1/6 + 1/14 = 7/42 + 3/42 = 10/42 = 5/21 job per hour.

  3. The three workers together finish one job in 3 hours, so their combined rate is 1/3 = 7/21 job per hour.

  4. Therefore Rupesh’s rate is 7/21 − 5/21 = 2/21 job per hour.

  5. For twice the work, the required amount is 2 jobs. Hence the time is 2 ÷ (2/21) = 2 × 21/2 = 21 hours.

Cross-check

In 21 hours, Rupesh completes 21 × (2/21) = 2 jobs, exactly twice the original work. Therefore, Rupesh alone takes 21 hours.

Explore the full course: Rssb Senior Computer Instructor

Loading lesson…