In the 2015 policy context reflected in this UGC NET question, to what…

2015

In the 2015 policy context reflected in this UGC NET question, to what installed renewable-energy capacity did the Government of India plan to raise capacity by 2030?

Answer: D. 350 GWConceptInstalled capacity is the maximum rated power that generating equipment can supply at one time; it is measured in gigawatts (GW), not in annual energy…

  1. A.

    175 GW

  2. B.

    200 GW

  3. C.

    250 GW

  4. D.

    350 GW

Show answer & explanation

Correct answer: D

Concept

Installed capacity is the maximum rated power that generating equipment can supply at one time; it is measured in gigawatts (GW), not in annual energy units.

A capacity target derived from a planned share can be estimated as: target capacity = planned share × projected total installed capacity.

Application

  1. The December 2015 exam context used a policy plan in which about 40% of a projected 850 GW total installed capacity in 2030 would come from renewable or other non-fossil sources.

  2. Applying the share gives 0.40 × 850 GW = 340 GW.

  3. The policy discussion and the exam key expressed this planning figure as the offered rounded target of 350 GW.

Contrast

  • 175 GW is about 20.6% of 850 GW.

  • 200 GW is about 23.5% of 850 GW.

  • 250 GW is about 29.4% of 850 GW.

  • 350 GW is about 41.2% of 850 GW, the offered figure closest to the planned 40% share.

Cross-check

Dividing 350 GW by 850 GW gives about 41.2%, consistent with the rounded planning estimate, and the final UGC NET December 2015 key confirms the 350 GW value.

Therefore, in the 2015 examination context, the target was 350 GW.