Consider the following schedule S: r1(x), r2 (z), w1(x), r3(x), r2(y), w2(y),…

Consider the following schedule 

S: r1(x), r2 (z), w1(x), r3(x), r2(y), w2(y), w3(x), r3(y), r2(x)

For the schedule S given above, two orderings of commit operations are specified. 
I: c1; c3; c2 

II: c1; c2; c3 

Which of these ordering ensures recoverability of schedule S?

  1. A.

    Only I 

  2. B.

    Both I and II 

  3. C.

    Only II 

  4. D.

    None of these

Attempted by 46 students.

Sign up free to check your answer

Sign up free

Explore the full course: Gate Guidance By Sanchit Sir

Loading lesson…