Consider the two schedules: S 1 : r1(x),r2(x),w2(x),r3(x),w1(x), w2(y),r3(y),…

Consider the two schedules:

S 1 : r1(x),r2(x),w2(x),r3(x),w1(x), w2(y),r3(y), c2,w3(x), c1, c3

S 2 : r2(x),r1(x),w1(x),w2(x),w2(y),r3(x),w3(x),r3(y), c1, c3, c2

Which of the schedules is recoverable?

  1. A.

    Only S2

  2. B.

    Only S1

  3. C.

    None of them

  4. D.

    Both S1 and S2

Attempted by 57 students.

Sign up free to check your answer

Sign up free

Explore the full course: Gate Guidance By Sanchit Sir

Loading lesson…