Consider the following schedules:
S1: R1(x) W1(x) R1(y) R2(x) W2(x) C2, C1;

S2: R2(x) W2(x) R1(y) R1(x) W2(x) C2, C1;

Which of the following is true?

  1. A.

    Both S1 and S2 are recoverable

  2. B.

    S1 is recoverable but S2 is not

  3. C.

    S2 is recoverable but S1 is not

  4. D.

    Both schedule are not Recoverable