Consider the following schedule S; R2(x), w2(x), R3(y), R1(x), R1(y), w1(x),…
Consider the following schedule
S; R2(x), w2(x), R3(y), R1(x), R1(y), w1(x), w3(y), R3(x), R1(y), C3, C2, C1;
The above schedule is
- A.
Recoverable but not cascade less
- B.
Recoverable and cascade less but not strict
- C.
Recoverable, cascade less and also strict
- D.
Not recoverable
Attempted by 38 students.
Sign up free to check your answer
Sign up freeLoading lesson…

