Activities which ensure that the software that has been built, is traceable to…

2009

Activities which ensure that the software that has been built, is traceable to customer requirement is covered as part of

  1. A.

    Verification

  2. B.

    Validation

  3. C.

    Maintenance

  4. D.

    Modeling

Attempted by 76 students.

Show answer & explanation

Correct answer: B

This question distinguishes between Verification and Validation in software engineering. Verification confirms compliance with specifications, whereas Validation ensures the product meets customer requirements and intended use. Traceability to 'customer requirement' specifically aligns with Validation activities.