Multilevel queue questions test whether you can separate fixed queue assignment from feedback-driven movement, follow priority and quantum changes, and keep a Gantt chart consistent when arrivals and context switches are added. GATE, UGC NET, ISRO and BEL questions sit alongside targeted practice questions. Solve each item before reading its explanation, and use the full Q4 trace to check every dispatch and context switch.

Multilevel queue scheduling: fix the model before attempting

Scheme

Queue assignment

Movement

Fixed multilevel queue

A process is permanently assigned to a class queue

No feedback-driven movement

Multilevel feedback queue (MLFQ)

A process starts in a queue selected by the design

It can move according to observed behaviour

Separate queue priority, within-queue policy, time quantum, promotion or demotion rule, and starvation control.

Q4 uses Q1 = highest priority, RR with 2 ms quantum, Q2 = RR with 4 ms quantum, and Q3 = RR with 8 ms quantum. Lower queues run only when higher ones are empty; a new process starts in Q1 and drops after using its full quantum. Other MLFQ designs can use different quanta and movement rules.

Classify the stem as fixed multilevel queue, feedback queue, two-level scheduling, or another OS queue before viewing options. Mark the decisive rule. Continue with Process Scheduling MCQs: 12 Solved (GATE), or revise through CPU scheduling: FCFS, SJF, Round Robin & priority.

MLFQ behaviour MCQs: movement, priority and quantum

Q1. Feedback queues, ISRO 2007 and BEL 2007

Feedback queues

  • A. are very simple to implement

  • B. dispatch tasks according to execution characteristics

  • C. are used to favour real time tasks

  • D. require manual intervention to implement properly

Answer: B. Consuming a full quantum or yielding early feeds later placement and priority decisions. This is neither manual nor limited to real-time tasks.

Q2. Long quantum placement in MLFQ

A multilevel feedback queue scheduler generally assigns a long quantum to:

  • A. High priority processes

  • B. Low priority processes

  • C. New processes

  • D. Old processes

Answer: B. Q1, Q2 and Q3 use 2 ms, 4 ms and 8 ms. Higher queues favour response; lower queues give CPU-bound work longer, cheaper runs, regardless of age alone.

Q3. False statement about MLFQ, UGC NET June 2015

Which of the following statements is not true for Multi Level Feedback Queue processor scheduling algorithm ?

  • A. Queues have different priorities

  • B. Each queue may have different scheduling algorithm

  • C. Processes are permanently assigned to a queue

  • D. This algorithm can be configured to match a specific system under design

Answer: C. Permanent assignment belongs to a fixed multilevel queue. MLFQ permits movement plus configurable priorities, policies and rules.

MLFQ numerical MCQ: construct the complete Gantt chart

Q4. Turnaround time, normalised turnaround and efficiency

Suppose the following jobs are to be executed in a uniprocessor system. Multilevel Feedback Queue(MLQ) is used with queues numbered 1-10, quantum = 2i , where i is the queue level number and processes are initially placed in the first queue (i.e., level 1). In this scheduling policy, each process executes at a particular level for one quantum and then moves down a level; processes never move up a level and assume context switch delay of 1ms. The average process turnaround time, the normalized turnaround time for process 2, and the processor efficiency using MLQ is,

Source table listing arrival and burst times for the five processes in the MLFQ numerical.

Process

Arrival Time

Burst

1

0

4

2

1

8

3

3

2

4

10

6

5

12

5

  • A. 11.4, 2, 83.3%

  • B. 11.6, 3.75, 80.6%

  • C. 18.6, 3.375, 71.4%

  • D. None of these

Answer: D. Read quantum = 2^i, giving 2 ms, 4 ms and 8 ms at the first three levels. With a 1 ms switch before every run, the timeline is CS 0-1, P1 1-3, CS 3-4, P2 4-6, CS 6-7, P3 7-9, CS 9-10, P1 10-12, CS 12-13, P4 13-15, CS 15-16, P5 16-18, CS 18-19, P2 19-23, CS 23-24, P4 24-28, CS 28-29, P5 29-32, CS 32-33, P2 33-35.

  • Completion times: C1=12, C2=35, C3=9, C4=28, C5=32.

  • Turnaround times, using completion - arrival: 12, 34, 6, 18, 20 ms.

  • Average turnaround: (12+34+6+18+20)/5 = 90/5 = 18 ms.

  • P2 normalised turnaround: 34/8 = 4.25.

  • Useful CPU work: 4+8+2+6+5 = 25 ms; efficiency: 25/35 x 100 = 71.4%.

Only C's efficiency is correct, so None of these wins.

MLFQ Gantt chart for five processes across three feedback queues, ending at 35 ms with 71.4 percent processor efficiency.

Scheduling-policy matching and MLFQ process behaviour

Q5. Match four schedulers to their characteristic, UGC NET June 2014

Match the following  :

List – IList – IIa.Multilevel feedback queuei.Time-slicingb.FCFSii.Criteria to move processesbetween queuesc.Shortest Process nextiii.Batch Processingd.Round robin schedulingiv.Exponential smoothening\begin{array}{clcl} & \textbf{List – I} && \textbf{List – II} \\ \text{a}. & \text{Multilevel feedback queue} & \text{i.} & \text{Time-slicing} \\ \text{b}. & \text{FCFS} & \text{ii.} & \text{Criteria to move processes} \\ &&& \text{between queues} \\ \text{c}. & \text{Shortest Process next} & \text{iii.} & \text{Batch Processing} \\ \text{d}. & \text{Round robin scheduling} & \text{iv.} & \text{Exponential smoothening} \\ \end{array}

Codes :

  • A. a-i; b-iii; c-ii; d-iv

  • B. a-iv; b-iii; c-ii; d-i

  • C. a-iii; b-i; c-iv; d-i

  • D. a-ii; b-iii; c-iv; d-i

Answer: D. MLFQ matches movement criteria (a-ii), FCFS matches batch processing (b-iii), shortest-process-next matches exponential smoothing (c-iv), and round robin matches time-slicing (d-i). Check every pair.

Q6. Correct scheduler statements, MSQ

Which of the following statements are correct?

  • A. Round robin is a pre-emptive scheduler and does not have starvation.

  • B. FCFS schedulers suffer from convoy effect.

  • C. Preemptive schedular lets the process finish its CPU burst but preempts the process when it went for I/O operation.

  • D. Multilevel feedback queue scheduler gives priority to I/O intensive process.

Answer: A, B and D. With P1, P2, P3 and 2 ms, round robin gives each a turn; FCFS can leave two 1 ms jobs behind one 20 ms job. Using 1 ms of 2 ms, an I/O-bound process yields and usually stays higher, so D is true. C reverses preemption: I/O blocking is voluntary; preemption interrupts a CPU burst.

MLFQ starvation control and two-level scheduling

Q7. Aging as starvation control, ISRO 2007

The term ‘aging’ refers to:

  • A. boosting the priority of a process in a fixed multilevel queue without feedback

  • B. tracking how long a page has been in memory for LRU replacement

  • C. letting a job reside in memory so its page requirement can be estimated

  • D. gradually increasing the priority of jobs that wait for a long time to prevent infinite blocking

Answer: D. Aging gradually raises the priority of a process that has waited for a long time. In an MLFQ design, periodic priority boosts can prevent a process from remaining indefinitely in a low-priority queue; the other choices describe unrelated memory-management mechanisms.

Q8. Why two-level CPU scheduling is used, UGC NET December 2014

Consider the following justifications for commonly using the two-level CPU scheduling :

I. It is used when memory is too small to hold all the ready processes.

II. Because its performance is same as that of the FIFO.

III. Because it facilitates putting some set of processes into memory and a choice is made from that.

IV. Because it does not allow to adjust the set of in-core processes.

Which of the following is true ?

  • A. I, III and IV

  • B. I and II

  • C. III and IV

  • D. I and III

Answer: D. Here I = true, II = false, III = true, and IV = false. Two-level scheduling controls an adjustable in-memory set, then chooses among its residents.

Scheduling-order and time-quantum MCQs

Q9. Weighted mean completion-time order, GATE IT 2007

Consider n jobs J₁, J₂,......Jₙ such that job Jᵢ has execution time tᵢ and a non-negative integer weight wᵢ. The weighted mean completion time of the jobs is defined to be

Source formula defining weighted mean completion time as summed weight times completion over total weight.

sum(i=1 to n) w_i T_i / sum(i=1 to n) w_i

where Tᵢ is the completion time of job Jᵢ. Assuming that there is only one processor available, in what order must the jobs be executed in order to minimize the weighted mean completion time of the jobs?

  • A. Non-decreasing order of tᵢ

  • B. Non-increasing order of wᵢ

  • C. Non-increasing order of wᵢtᵢ

  • D. None-increasing order of wᵢ/tᵢ

Answer: D. Use non-increasing w_i/t_i; the option retains the typo. For A: t=2, w=10 and B: t=5, w=15, ratios 5 and 3 put A first: 10x2 + 15x7 = 125, versus 15x5 + 10x7 = 145. Division by 25 gives 5.0 versus 5.8.

Q10. Time quantum within a queue, ISRO 2020

Which of the following algorithms defines a time quantum?

  • A. Shortest Job First

  • B. Round Robin

  • C. Priority scheduling

  • D. Multilevel queue scheduling

Answer: B. Round Robin defines a fixed time quantum and preempts a process when its slice expires. A multilevel queue scheduler may use Round Robin within one or more queues, but the quantum belongs to that within-queue policy rather than to the multilevel structure itself.

Multilevel queue MCQ answer audit and next practice step

Question

Correct answer

Decisive rule

Trap

Q1

B

Observed behaviour

Behaviour-based dispatch

Q2

B

Lower queue, longer quantum

Long quantum in low queue

Q3

C

MLFQ permits movement

Permanent assignment belongs to fixed MLQ

Q4

D

Recompute all metrics

One correct value does not make a numerical option correct

Q5

D

Verify all pairs

Solve every matching pair

Q6

A+B+D

I/O-bound priority

I/O-bound process priority

Q7

D

Priority rises with waiting time

Scheduling aging versus page-replacement age

Q8

D

Adjustable in-core set

Two-level scheduling can adjust the in-core set

Q9

D

Non-increasing w_i/t_i

Ratio versus product

Q10

B

Round Robin uses a fixed time slice

Queue structure versus within-queue policy

Q1 to Q3 test definitions and movement; Q4 tests timeline arithmetic; Q5 and Q6 test comparison; Q7 and Q8 test starvation control and two-level scheduling; Q9 and Q10 test ordering and within-queue policy. Attempt all 10, label misses definition, timeline, matching or boundary, then retry them after 48 hours. Below 8, redraw Q4 and review how each queue schedules its own processes.

Use GATE Guidance by Sanchit Sir for GATE or NTA-UGC-NET Paper - 2 for NET. Compare routes through GATE CS Exam Preparation. The short version: separate fixed queues from feedback, draw the timeline, and accept only fully correct options.