If in a software project the number of user input, user output, enquiries,…
ISRO Scientist/Engineer SC 2015Modified — slightly modified from the official paper; see the solution
If in a software project the number of user input, user output, enquiries, files and external interfaces are (15, 50, 24, 12, 8), respectively, with complexity average weighing factor. The productivity if effort = 70 person-month is
- A.
8.31
- B.
408.74
- C.
304.78
- D.
220.14
Attempted by 179 students.