The number of function points of a proposed system is calculated as 500.…

PYQ UGC NET 2016

The number of function points of a proposed system is calculated as 500. Suppose that the system is planned to be developed in Java and the LOC/FP ratio of Java is 50. Estimate the effort (E) required to complete the project using the effort formula of basic COCOMO given below :

E = a(KLOC)b

Assume that the values of a and b are 2.5 and 1.0 respectively.

  1. A.

    25 person months

  2. B.

    75 person months

  3. C.

    62.5 person months

  4. D.

    72.5 person months