A, B and C together can do a work in 4 days, while B alone can do the same…
PYQ IBPS 2024 (paper not recorded)
A, B and C together can do a work in 4 days, while B alone can do the same work in 24 days. If efficiency of C is 300% more than that of B, then find the difference between number of days taken by A and C to complete the work alone?
- A.
18
- B.
12
- C.
11
- D.
15
- E.
20
Attempted by 20 students.
Sign up free to check your answer