A, B and C together can do a work in 4 days, while B alone can do the same work in 24 days. If efficiency of C is 300% more than that of B, then find the difference between number of days taken by A and C to complete the work alone?

  1. A.

    18

  2. B.

    12

  3. C.

    11

  4. D.

    15

  5. E.

    20