PYQ Questions
This video lesson is available to enrolled students.
Return to /learn/HPSC-PGT-COMPUTER-SCIENCE/computer-networks/dll-flow-control/basics-delay-analysis/pyq-questions after enrolling
Inside: a video lesson and guided study material.
Module outline
- HPSC Interview Preparation: Interview Preparation
- Python Language: Introduction to Python, Tokens, Variables, Data Types, I/O, Operators & Expressions, Control Flow & Looping, Collections & Strings, Functions & Modules, File Handling & Data Analysis, DSA using Python
- Data Structure & Algorithms: Introduction to DS, Array, Stack, Queue, Linked List, Tree, Graphs, Hashing, Algorithm Analysis, Sorting Algorithms, Minimum Spanning Trees, Time Complexity Analysis, Graph Theory, Shortest Path Algos
- Computer Networks: Introduction to CN, Data Communication, DLL: Access Control, DLL: Flow Control, Data Link Layer - Ethernet, Net Layer: IPv4 & Proto, Net Layer: IP Addressing, Transport Layer Services, TL: Congestion & UDP, Application Layer, Hardware basics, Network Security
- Computer System & Organisation: Basics of COA, Cache Memory Organization, Input Output Organisation, Pipelining, Instr Formats & Modes, Control Unit Design, Programming the Basic Computer
- Database Management System: Basics of DBMS, ER Diagram, Relational Model & Functional Dependencies, Keys & Integrity Constraints, Normalization (1NF - BCNF), Decomposition Properties & 4NF, SQL, File Organization & Indexing, Transaction Management, Concurrency Control
- Operating Systems: Introduction to OS, Process Management, CPU Scheduling, Process Synchronization, Deadlock, Threads & Process Creation, Memory Management, Virtual Memory, Disc Scheduling
- Digital Logic & Circuits: Digital Systems & Boolean Basics, Logic Gates & Hardware, Boolean Expression, Boolean Minimization, Combinational Circuit, Sequential Circuits, Number System, Number Representation
- Theory Of Computation: Introduction to TOC, Deterministic FA (DFA), Non-Deterministic FA, Regular Expressions, Grammar, Regular Language Properties, Pushdown Automata & CFG, Turing Machines, Moore & Mealy Machines
- Compiler Design: Intro to Compilers, Lexical Analysis, Grammar & CFG, Syntax Analysis: Top-Down, Syntax Analysis: Bottom-Up, Semantic Analysis & SDT, Intermediate Code Gen, Code Optimization, Run Time Environment
- Software Engineering: Fundamentals of Software Engineering, Software Requirements and Quality Assurance, Software Design, Estimation and Metrics, Software Testing, Software Maintenance and Configuration Management, Data Warehousing & Mining
- Introduction to Emerging Trends: Emerging Tech Trends
- Digital Society & Cyber Law: Society, Law & Ethics
- HPSC PGT Previous Year Paper:
- HPSC Assistant Professor Previous Year Paper:
- Live Sessions: HPSC Live Sessions, EMRS TGT/PGT Live Class
- Full Mock Test:
- HPSC PGT - MOCK Test Series:
Loading lesson…