Basics and Delay Analysis

This PDF lesson is available to enrolled students.

Return to /learn/HPSC-PGT-COMPUTER-SCIENCE/computer-networks/dll-flow-control/basics-delay-analysis/asset-basics-and-delay-analysis-19283 after enrolling

Inside: notes and a PDF lesson.

Module outline

  1. HPSC Interview Preparation: Interview Preparation
  2. Python Language: Introduction to Python, Tokens, Variables, Data Types, I/O, Operators & Expressions, Control Flow & Looping, Collections & Strings, Functions & Modules, File Handling & Data Analysis, DSA using Python
  3. Data Structure & Algorithms: Introduction to DS, Array, Stack, Queue, Linked List, Tree, Graphs, Hashing, Algorithm Analysis, Sorting Algorithms, Minimum Spanning Trees, Time Complexity Analysis, Graph Theory, Shortest Path Algos
  4. Computer Networks: Introduction to CN, Data Communication, DLL: Access Control, DLL: Flow Control, Data Link Layer - Ethernet, Net Layer: IPv4 & Proto, Net Layer: IP Addressing, Transport Layer Services, TL: Congestion & UDP, Application Layer, Hardware basics, Network Security
  5. Computer System & Organisation: Basics of COA, Cache Memory Organization, Input Output Organisation, Pipelining, Instr Formats & Modes, Control Unit Design, Programming the Basic Computer
  6. Database Management System: Basics of DBMS, ER Diagram, Relational Model & Functional Dependencies, Keys & Integrity Constraints, Normalization (1NF - BCNF), Decomposition Properties & 4NF, SQL, File Organization & Indexing, Transaction Management, Concurrency Control
  7. Operating Systems: Introduction to OS, Process Management, CPU Scheduling, Process Synchronization, Deadlock, Threads & Process Creation, Memory Management, Virtual Memory, Disc Scheduling
  8. Digital Logic & Circuits: Digital Systems & Boolean Basics, Logic Gates & Hardware, Boolean Expression, Boolean Minimization, Combinational Circuit, Sequential Circuits, Number System, Number Representation
  9. Theory Of Computation: Introduction to TOC, Deterministic FA (DFA), Non-Deterministic FA, Regular Expressions, Grammar, Regular Language Properties, Pushdown Automata & CFG, Turing Machines, Moore & Mealy Machines
  10. Compiler Design: Intro to Compilers, Lexical Analysis, Grammar & CFG, Syntax Analysis: Top-Down, Syntax Analysis: Bottom-Up, Semantic Analysis & SDT, Intermediate Code Gen, Code Optimization, Run Time Environment
  11. Software Engineering: Fundamentals of Software Engineering, Software Requirements and Quality Assurance, Software Design, Estimation and Metrics, Software Testing, Software Maintenance and Configuration Management, Data Warehousing & Mining
  12. Introduction to Emerging Trends: Emerging Tech Trends
  13. Digital Society & Cyber Law: Society, Law & Ethics
  14. HPSC PGT Previous Year Paper:
  15. HPSC Assistant Professor Previous Year Paper:
  16. Live Sessions: HPSC Live Sessions, EMRS TGT/PGT Live Class
  17. Full Mock Test:
  18. HPSC PGT - MOCK Test Series:
Loading lesson…