PYQ Questions
This video lesson is available to enrolled students.
Return to /learn/APTITUDE-FOR-GATE/general-aptitude/project-monitoring-resources-and-safety/cost-control-and-earned-value-kwy8hz/pyq-questions after enrolling
Inside: a video lesson and guided study material.
Module outline
- Engineering Maths: Linear Algebra, Calculus, Permutation and Combination, Probability, Statistics, Powers, Surds and Logarithms, Number System, Alphabet and Word Tests, Sequences and Series, Transformation of Shapes, Signal Space and Optimum Detection, Probability, Statistics, Combinatorics
- General Aptitude: Data Interpretation, HCF LCM, Number System, Percentage, Ratio and Proportion (Ratios), Logarithm, Sequence and Series (Series), Mensuration and Geometry, Mental Ability, Arithmetic, Speed Time and Distance, Profit and Loss, Powers and Exponents (Surds and Indices), Average, Deductive and Inductive Reasoning (Logical Deduction and Induction) (Prepositional Reasoning), Syllogisms, Venn Diagram, Seating Arrangements, Coding Decoding, Data Sufficiency, Blood Relations, Directions (Direction Test), Series (Number and Letter Series) (Numerical Relations and Reasoning), Analogy, Non Verbal Reasoning (Spatial Aptitude) (Spatial Reasoning) (Visual Reasoning), Algebra, Analytical Reasoning (Counting Figures Reasoning), Puzzle Solving (Puzzles), Cubes & Dices, Ranking, Order and Sequence, Mixture and Alligation, Age Problems, Clock, Selection Decision Table (Decision Making), Data Arrangement, Statistics, Averages, Mixtures and Alligation, Geometry, Three-Dimensional Patterns and Visualization, Permutations and Combinations, Simplification and Approximation, Percentages, Ratio and Proportion, Profit, Loss and Discount, Vocabulary, Subject-Verb Agreement, Sentence Completion, Reading Comprehension, Trigonometry, Mensuration, Patterns in Two-Dimensional Figures, Probability, Measurement and Quantity Take-Off, Numerical Reasoning, Sentence Structure and Correction, Critical Reasoning, Syllogisms and Venn Diagrams, Coding and Decoding, Series Completion, Order, Ranking and Sequence, Constraint Puzzles, Mathematical Operations, Logical Deduction and Induction, Narrative Sequencing, Project Monitoring, Resources and Safety, Analogy and Classification, Direction Sense, Traverse Surveying, Assembling and Grouping of Shapes, Cubes and Dice, Clocks and Calendars, Data Interpretation, Algebra, Time and Work, Speed, Time and Distance, Data Sufficiency, Blood Relations, Simple Interest and Compound Interest, Calendar
- English (Verbal Aptitude): Vocabulary, Noun, Pronoun, Preposition, Direct and Indirect Speech, Sentence Re-arrangements (Para Jumbles) (Narrative Sequencing), Comprehension / Reading Comprehension / Unseen Passages (Critical Reasoning) (Paragraph Questions), Sentence Correction (Error Correction), Verbal Analogy (Word Based Analogy), Adjectives, Conjunction, Verb, Tenses, Subject Verb Agreement (Verb Noun Agreement), Articles, Adverb, Modals, Prepositions and Conjunctions, Idioms and Phrases, Verb Forms and Verb Patterns, Sentence Basics, Nouns and Pronouns, Adjectives and Adverbs, Articles and Determiners, Voice and Reported Speech, Modals, Conditionals and Subjunctive, Blood Relations, Tenses, Vocabulary
Loading lesson…

