Consider two hosts \(X\) and \(Y\), connected by a single direct link of rate…
PYQ GATE 2017
Consider two hosts and , connected by a single direct link of rate 106bits/sec. The distance between the two hosts is 10,000km and the propagation speed along the link is 2×108m/sec. Host sends a file of 50,000 bytes as one large message to host continuously. Let the transmission and propagation delays be milliseconds and milliseconds respectively. Then the value of and are
- A.
and - B.
and - C.
and - D.
and
Attempted by 240 students.
Sign up free to check your answer
Sign up freeLoading lesson…

