Match the following : (a) Unit test (i) Requirements (b) System test (ii)…

UGC NET 2007

Match the following : (a) Unit test (i) Requirements (b) System test (ii) Design (c) Validation test (iii) Code (d) Integration test (iv) System Engineering Which of the following is true : (a) (b) (c) (d)

  1. A.

    (ii) (iii) (iv) (i)

  2. B.

    (i) (ii) (iv) (iii)

  3. C.

    (iii) (iv) (i) (ii)

  4. D.

    None of the above

Attempted by 20 students.

Sign up free to check your answer

Sign up free

Explore the full course: Uppsc Polytechnic Lecturer 2025 Cs

Loading lesson…