Practice Question
Duration: 11 min
This video lesson is available to enrolled students.
Inside: a video lesson and guided study material.
Module outline
- About Course: UPPSC Course Overview
- Interview Preparation & Guidance: Interview Preparation
- Paper 1 | General Hindi: भाषा, लिपि, ध्वनि, वर्ण, अक्षर, स्वर, व्यंजन, मात्रा और संयुक्ताक्षर, वर्तनी, वर्ण-विन्यास, अनुस्वार, अनुनासिक, चंद्रबिंदु और ‘र’ के रूप, शब्द, पद और शब्द-भेद, संज्ञा और सर्वनाम, विशेषण और क्रिया, लिंग, वचन, पुरुष और कारक, काल, वाच्य, वाक्य और वाक्य-भेद, वर्णमाला, समास, संधि, विलोम शब्द, पर्यायवाची शब्द, सामान्य अशुद्धियाँ, अनेक शब्दों के लिए एक शब्द, मुहावरे और लोकोक्तियाँ, अपठित गद्यांश और अपठित पद्यांश, Multi-Topic Content (Cross-Concept Material)
- Paper 2 | General Studies: State Wise GK, Polity, Geography, History, GK- Current Affairs
- Paper 1 | Programming Language: Language Design, C Fundamentals, Control Flow, Functions, Arrays & Pointers, Storage Classes, Structures & Enums, DMA, Macros, Scoping & File Handling, OOPS with C++
- Paper 1 | Database Management Systems: Basics of DBMS, ER Diagram, Relational Model & Functional Dependencies, Keys & Integrity Constraints, Normalization (1NF - BCNF), Decomposition Properties & 4NF, File Organization & Indexing, Relational Algebra, SQL, Relational Calculus, Transaction Management, Concurrency Control, ORDBMS, NoSQL
- Paper 1 | Cyber Security: Society, Law & Ethics, Cyber Threats and Malware Attacks, Role of Internet and Web Services, Security in Mobile and Wireless Computing, Electronic Data Interchange and E-Commerce, Physical Security and Cryptography Basics, Intrusion Detection Systems (IDS), Cyber Safety and Security, Ethical Hacking
- Paper 1 | Computer Organization and Architecture: Basics of COA, Programming the Basic Computer, Cache Memory Organization, Input Output Organisation, Instr Formats & Modes, Register Transfer and Microoperations, Control Unit Design
- Paper 1 | Computer Networks: Introduction to CN, Data Communication, DLL: Access Control, DLL: Flow Control, DLL: Error Control, DLL: Framing, Data Link Layer - Ethernet, Net Layer: IPv4 & Proto, Net Layer: IP Addressing, Net Layer:Routing Protocol, Transport Layer Services, TL: Congestion & UDP, Application Layer, Hardware basics, Network Security
- Paper 1 | Design and Analysis of Algorithms: Algorithm Analysis, Time Complexity Analysis, Sorting Algorithms, Greedy Algorithms, Dynamic Programming, Minimum Spanning Trees, Shortest Path Algos, Advanced Algorithms
- Paper 1 | Data Structures: Introduction to DS, Array, Linked List, Stack, Queue, Tree, Graphs, Hashing
- Paper 1 | Discrete Structures and Theory of Logic: Permutation and Combination, Set Theory, Relations, Functions, Propositional and Predicate Logic, Graph Theory, Group Theory
- Paper 1 | Software Project Management: Software Project Management
- Paper 2 | Operating Systems: Introduction to OS, Process Management, CPU Scheduling, Process Synchronization, Threads & Process Creation, Deadlock, Memory Management, Virtual Memory, Disc Scheduling, File Management, Unix OS, Linux OS, Security
- Paper 2 | Compiler Design: Intro to Compilers, Lexical Analysis, Grammar & CFG, Syntax Analysis: Top-Down, Syntax Analysis: Bottom-Up, Semantic Analysis & SDT, Intermediate Code Gen, Code Optimization, Run Time Environment, Introduction to TOC, Deterministic FA (DFA), Non-Deterministic FA, Regular Expressions, Pushdown Automata & CFG, Complexity Theory
- Paper 2 | Artificial Intelligence & High Performance Computing: Approaches to AI, Search Algorithms, Game Playing, Knowledge Representation, Planning, Multi Agent Systems, Natural Language Processing, Emerging Tech Trends
- Paper 2 | Image Processing: Digital Image Fundamentals, Image Enhancement, Image Restoration, Color Image Processing, Image Compression
- Paper 2 | Software Engineering: Fundamentals of Software Engineering, Software Requirements and Quality Assurance, Software Design, Estimation and Metrics, Software Testing, Software Maintenance and Configuration Management
- Paper 2 | Computer Graphics: Basics of Computer Graphics, 2-D Geometrical Transforms and Viewing, 3-D Object Representation, Geometric Transformations and Viewing
- Paper 2 | Web Technologies: Website, Browser & Services, Internet Fundamentals, Web Design & Development, Protocols & Services, Web Publishing & Hosting, Server Side & Security, Emerging Technologies, HTML Basics, JavaScript-Basics, Java
- Paper 2 | Soft Computing: Fuzzy Sets, Artificial Neural Networks, Genetic Algorithms
- Paper 2 | Distributed System: Distributed Systems
- UPPSC Live Class Recordings: UPPSC Polytechnic Lecturer 2025 (CS)
- Previous Year Papers:
- Mock Test:
AI summary & chapters
AI Summary
An AI-generated summary of this video lecture.
This lecture demonstrates how to calculate Average Turnaround Time (TAT) and Average Waiting Time (WT) using the First Come First Serve (FCFS) scheduling algorithm. The instructor works through two practice problems on a whiteboard, using a table with columns for Process Number, Arrival Time (AT), Burst Time (BT), Completion Time (CT), TAT = CT - AT, and WT = TAT - BT. For the first problem, processes P0 (AT 0, BT 3), P1 (AT 2, BT 2), and P2 (AT 6, BT 4) are scheduled in arrival order. A Gantt chart shows P0 running from 0 to 3, P1 from 3 to 5, an idle gap from 5 to 6, and P2 from 6 to 10. Completion times are 3, 5, and 10, giving TAT values of 3, 3, and 4, and WT values of 0, 1, and 0. The instructor writes Avg TAT = 10/3 and Avg Waiting Time = 1/3. A second problem uses processes with AT 0, 0, 1 and BT 4, 6, 3. The Gantt chart shows P0 from 0 to 4, P1 from 4 to 10, and P2 from 10 to 13, with CT values 4, 10, 13, TAT values 4, 10, 12, and WT values 0, 4, 9. The instructor writes Avg TAT = 24/3 and Avg WT = 13/3. Ready and Run state diagrams are used to track which processes are waiting and which is executing.
Chapters
0:00 – 2:00 00:00-02:00
The whiteboard displays the question: 'Calculate the Average Turnaround Time (TAT) and Average Waiting Time (WT) using the FCFS (First Come First Serve) Scheduling Algorithm.' A table is set up with columns P. No, Arrival Time (AT), Burst Time (BT), Completion Time (CT), TAT = CT - AT, and WT = TAT - BT. Rows show P0 (AT 0, BT 3), P1 (AT 2, BT 2), P2 (AT 6, BT 4), and an empty Average row. The instructor begins drawing a green Gantt chart below the table and labels Ready and Run states in a diagram.
2:00 – 5:00 02:00-05:00
The instructor builds the Gantt chart for the first problem: P0 runs from 0 to 3, P1 from 3 to 5, an idle gap is marked in red from 5 to 6, and P2 runs from 6 to 10. Time markers 3, 5, and 6 are written beneath the chart. He then fills the table with pink values: CT 3, 5, 10 and TAT 3, 3, 4. Red checkmarks and circles mark the AT values 0, 2, 6 and BT values 3, 2, 4, confirming the input data before computing derived columns.
5:00 – 10:00 05:00-10:00
The instructor completes the first problem by writing Avg Waiting Time = 1/3 and Avg TAT = 10/3 on the right side of the board, alongside Ready and Run circles containing P0, P1, P2. He then introduces a second problem with a new table headed Prd, AT, BT, CT, TAT, WT showing arrival values 0, 0, 1 and burst values 4, 6, 3. He sketches a green Gantt bar and a two-circle diagram labeled 'Ready P0, P1' and 'Run' with a magenta 'FCFS' label, circling the zero arrival entries for P0 and P1.
10:00 – 11:01 10:00-11:01
The second problem is completed on the board. The table shows CT values 4, 10, 13 and a TAT-BT/WT column listing 0, 4, 9. The instructor writes Avg TAT = 24/3 and Avg WT = 13/3. A green Gantt chart at the bottom displays P0, P1, P2 with time markers 4, 10, 13, confirming the execution order P0 (0-4), P1 (4-10), P2 (10-13).
The lecture teaches FCFS scheduling through two worked examples. The method is: (1) list processes by arrival time; (2) draw a Gantt chart showing execution order, including idle gaps when no process is ready; (3) compute CT from the Gantt chart; (4) compute TAT = CT - AT; (5) compute WT = TAT - BT; (6) average TAT and WT across all processes. Key evidence: first problem yields CT 3, 5, 10; TAT 3, 3, 4; WT 0, 1, 0; Avg TAT = 10/3; Avg WT = 1/3. Second problem yields CT 4, 10, 13; TAT 4, 10, 12; WT 0, 4, 9; Avg TAT = 24/3; Avg WT = 13/3. The Ready/Run diagram helps track which processes are waiting versus executing. Idle time in the Gantt chart (e.g., 5 to 6 in the first problem) does not contribute to any process's execution but affects completion times of later processes.