Practice Questions

Duration: 11 min

This video lesson is available to enrolled students.

Return to /learn/TPSC-ASSISTANT-TECHNICAL-OFFICER/general-mental-ability-logical-reasoning/time-and-work/multiple-topics/asset-practice-questions-8019 after enrolling

Inside: a video lesson and guided study material.

Module outline

  1. About Course: About the Course
  2. Paper 2 | Digital Logic: Digital Systems & Boolean Basics, Logic Gates & Hardware, Boolean Expression, Boolean Minimization, Combinational Circuit, Sequential Circuits, Number System, Number Representation, Floating Point Rep
  3. Paper 2 | Computer Organization And Architecture: Basics of COA, Cache Memory Organization, Input Output Organisation, Pipelining, Control Unit Design, Instr Formats & Modes, Programming the Basic Computer
  4. Paper 2 | Analog And Digital Communication: Introduction to Communication Systems & Random Signals, Analog Communication Systems, Information Theory & Digital Communication Fundamentals, Digital Modulation & Detection Techniques, Error Control, Synchronization & Multiple Access Techniques
  5. Paper 2 | Programming in C: C Fundamentals, Control Flow, Functions, Arrays & Pointers, Storage Classes, Structures & Enums, DMA, Macros, Scoping & File Handling
  6. Paper 2 | Data Structures And Programming: Introduction to DS, Array, Stack, Queue, Linked List, Tree, Graphs, Hashing, Java, OOPS with C++, Java Fundamentals, Array, String, IO & References
  7. Paper 2 | Algorithms: Algorithm Analysis, Sorting Algorithms, Time Complexity Analysis, Greedy Algorithms, Dynamic Programming, Minimum Spanning Trees, Shortest Path Algos
  8. Paper 2 | Compiler Design: Intro to Compilers, Lexical Analysis, Grammar & CFG, Syntax Analysis: Top-Down, Syntax Analysis: Bottom-Up, Semantic Analysis & SDT, Intermediate Code Gen, Code Optimization, Run Time Environment
  9. Paper 2 | Operating System: Introduction to OS, Process Management, CPU Scheduling, Process Synchronization, Threads & Process Creation, Deadlock, Memory Management, Virtual Memory, Disc Scheduling, File Management, Unix OS, Linux OS
  10. Paper 2 | Databases: Basics of DBMS, ER Diagram, Relational Model & Functional Dependencies, Keys & Integrity Constraints, Normalization (1NF - BCNF), Decomposition Properties & 4NF, Relational Algebra, SQL, Relational Calculus, File Organization & Indexing, Transaction Management, Concurrency Control
  11. Paper 2 | Information Systems and Software Engineering: Fundamentals of Software Engineering, Software Requirements and Quality Assurance, Software Design, Estimation and Metrics, Software Testing, Software Maintenance and Configuration Management
  12. Paper 2 | Computer Networks: Introduction to CN, Data Communication, DLL: Access Control, DLL: Flow Control, DLL: Error Control, DLL: Framing, Data Link Layer - Ethernet, Net Layer: IPv4 & Proto, Net Layer: IP Addressing, Net Layer:Routing Protocol, Transport Layer Services, TL: Congestion & UDP, Application Layer, Hardware Basics
  13. Paper 2 | Internet & Web Technologies: Website, Browser & Services, Internet Fundamentals, Web Design & Development, Protocols & Services, Web Publishing & Hosting, Server Side & Security, Emerging Technologies, HTML Basics, JavaScript-Basics, CSS, XML, HTML5
  14. Paper 2 | Cyber Security And Emerging Technologies: Emerging Tech Trends
  15. Paper 2 | Cloud Technology: Cloud Computing
  16. Paper 2 | Probability and statistics: Probability, Statistics
  17. Paper-1 English: Vocabulary, Preposition, Articles, Comprehension / Reading Comprehension / Unseen Passages (Critical Reasoning) (Paragraph Questions), Sentence Re-arrangements (Para Jumbles) (Narrative Sequencing), Sentence Correction (Error Correction), Sentence Completion (Fill in the blanks), Cloze Test (Cloze Passage), Sentence Construction
  18. Paper 1 General Mental Ability & Logical reasoning: Ratio and Proportion (Ratios), Divisibility Rules, Data Interpretation, Mixture and Alligation, Permutation and Combination, Logarithm, Number System, HCF LCM, Sequence and Series (Series), Speed Time and Distance, Series (Number and Letter Series) (Numerical Relations and Reasoning), Coding Decoding, Data Sufficiency, Non Verbal Reasoning (Spatial Aptitude) (Spatial Reasoning) (Visual Reasoning), Percentage, Average, Powers and Exponents (Surds and Indices), Algebra, Profit and Loss, Simple Interest and Compound Interest, Time and Work, Pipe and Cistern, Mensuration and Geometry, Mental Ability, Age Problems, Partnership, Arithmetic, Speed Mathematics and Basic Mathematics, Syllogisms, Deductive and Inductive Reasoning (Logical Deduction and Induction) (Prepositional Reasoning), Seating Arrangements, Blood Relations, Directions (Direction Test), Analytical Reasoning (Counting Figures Reasoning), Puzzle Solving (Puzzles), Calendar, Clock, Cubes & Dices, Selection Decision Table (Decision Making), Logical Sequence Of Words, Venn Diagram, Analogy
  19. Paper-1 General Knowledge & Current Affairs: State Wise GK, History, Geography, GK- Current Affairs, Static General Knowledge
  20. Full Length Mock Test:
AI summary & chapters

AI Summary

An AI-generated summary of this video lecture.

This educational video is a lecture on solving work and time problems, presented by an instructor named Yash Jain Sir. The video begins with an introduction to a problem where Deepika and Ranveer complete a task together, and the goal is to find Deepika's share of the earnings. The instructor demonstrates two methods to solve this. The first method, the LCM method, involves calculating the total work as the Least Common Multiple of their individual completion times (20 and 15 days), which is 60 units. This allows for the calculation of their individual work rates (Deepika: 3 units/day, Ranveer: 4 units/day). The total earnings are then divided in the ratio of their work rates (3:4), resulting in Deepika's share being Rs. 24,000. The second method, the Efficiency method, uses the inverse relationship between time and efficiency. The time ratio is 20:15, which simplifies to 4:3, so the efficiency ratio is 3:4, leading to the same result. The video then transitions to a second problem about robots completing a contract, using the formula M1 * E1 * T1 = M2 * E2 * T2 to find the number of additional robots needed. Finally, a summary slide presents a 'Two Second Trick' for combined work problems: if A takes 'a' days and B takes 'b' days, their combined time is (a*b)/(a+b). The video concludes with a 'Thanks for Watching' screen.

Chapters

  1. 0:00 – 2:00 00:00-02:00

    The video opens with a title card for 'TIME & WORK' and then transitions to a lecture slide. The instructor, Yash Jain Sir, presents the first problem: 'Q1: Deepika does a work in 20 days while Ranveer does the same work in 15 days. They worked together and earned Rs 56000 to complete the task. Find the share of Deepika?'. The options are (A) Rs. 18000, (B) Rs. 22000, (C) Rs. 24000, (D) Rs. 32000. The instructor introduces the problem and the concept of finding shares based on work done.

  2. 2:00 – 5:00 02:00-05:00

    The instructor begins solving the first problem using 'Method 1 (Using LCM Method)'. He writes on the board that 'total work = LCM(20,15)'. He calculates the LCM of 20 and 15, which is 60, and writes 'total = 60 units'. He then calculates the work rate for Deepika as 60/20 = 3 units/day and for Ranveer as 60/15 = 4 units/day. He explains that the ratio of their work is 3:4, and the total earnings of Rs. 56000 are to be divided in this ratio. He calculates Deepika's share as (3/7) * 56000 = Rs. 24000, which corresponds to option (C).

  3. 5:00 – 10:00 05:00-10:00

    The instructor introduces 'Method 2 (Using Efficiency Method)'. He writes the formula 'Total Work = Efficiency * Time' and states that 'Time ∝ 1/Efficiency'. He calculates the time ratio of Deepika to Ranveer as 20:15, which simplifies to 4:3. He then states that the efficiency ratio is the inverse, 3:4. He uses this ratio to find Deepika's share: (3/7) * 56000 = Rs. 24000. The video then transitions to a new problem about robots, stating: 'A contract is to be completed in 52 days and 125 identical robots were employed each operational for 7 hours a day. After 39 days, 5/7 of the work was completed. How many additional robots would be required to complete the work on time, if each robot is now operational for 8 hours a day?'. He writes the formula M1 * E1 * T1 = M2 * E2 * T2 and begins to substitute values.

  4. 10:00 – 11:30 10:00-11:30

    The instructor continues solving the robot problem. He calculates the remaining time as 52 - 39 = 13 days. He sets up the equation: 125 * 7 * 39 = x * 8 * 13, where x is the number of robots needed for the remaining work. He simplifies the equation to find x = 250. He then calculates the additional robots required as 250 - 125 = 125. The video then shows a summary slide with 'Case 1: Alone works are given, task is to find the combined work?' and 'Case 2: Alone work of A is given, combined work of A and B are given, task is to find the alone work of B?'. He presents a 'Two Second Trick' for Case 1: Product/Sum = (a*b)/(a+b). The video ends with a 'THANKS FOR WATCHING' screen.

The video provides a comprehensive tutorial on work and time problems, focusing on two primary methods for calculating shares and completion times. It effectively demonstrates the LCM method, which converts work into a common unit to find individual contributions, and the Efficiency method, which uses the inverse relationship between time and efficiency. The core concept is that the share of earnings or the amount of work done is proportional to the individual's work rate or efficiency. The video also introduces a practical application with the robot problem, using the formula for work (M * E * T) to solve for an unknown variable. The final summary reinforces the key formulas and tricks, making the concepts accessible for quick problem-solving, particularly for competitive exams.

Loading lesson…