NEEPCO commissioned a 5 MW grid-interactive solar photovoltaic power station

Duration: 3 min

This video lesson is available to enrolled students.

Return to /learn/TPSC-ASSISTANT-TECHNICAL-OFFICER/general-knowledge-current-affairs/state-wise-gk/tripura-gk/asset-neepco-commissioned-a-5-mw-grid-interactive-solar-photovoltaic-power-station after enrolling

Inside: a video lesson and guided study material.

Module outline

  1. About Course: About the Course
  2. Paper 2 | Digital Logic: Digital Systems & Boolean Basics, Logic Gates & Hardware, Boolean Expression, Boolean Minimization, Combinational Circuit, Sequential Circuits, Number System, Number Representation, Floating Point Rep
  3. Paper 2 | Computer Organization And Architecture: Basics of COA, Cache Memory Organization, Input Output Organisation, Pipelining, Control Unit Design, Instr Formats & Modes, Programming the Basic Computer
  4. Paper 2 | Analog And Digital Communication: Introduction to Communication Systems & Random Signals, Analog Communication Systems, Information Theory & Digital Communication Fundamentals, Digital Modulation & Detection Techniques, Error Control, Synchronization & Multiple Access Techniques
  5. Paper 2 | Programming in C: C Fundamentals, Control Flow, Functions, Arrays & Pointers, Storage Classes, Structures & Enums, DMA, Macros, Scoping & File Handling
  6. Paper 2 | Data Structures And Programming: Introduction to DS, Array, Stack, Queue, Linked List, Tree, Graphs, Hashing, Java, OOPS with C++, Java Fundamentals, Array, String, IO & References
  7. Paper 2 | Algorithms: Algorithm Analysis, Sorting Algorithms, Time Complexity Analysis, Greedy Algorithms, Dynamic Programming, Minimum Spanning Trees, Shortest Path Algos
  8. Paper 2 | Compiler Design: Intro to Compilers, Lexical Analysis, Grammar & CFG, Syntax Analysis: Top-Down, Syntax Analysis: Bottom-Up, Semantic Analysis & SDT, Intermediate Code Gen, Code Optimization, Run Time Environment
  9. Paper 2 | Operating System: Introduction to OS, Process Management, CPU Scheduling, Process Synchronization, Threads & Process Creation, Deadlock, Memory Management, Virtual Memory, Disc Scheduling, File Management, Unix OS, Linux OS
  10. Paper 2 | Databases: Basics of DBMS, ER Diagram, Relational Model & Functional Dependencies, Keys & Integrity Constraints, Normalization (1NF - BCNF), Decomposition Properties & 4NF, Relational Algebra, SQL, Relational Calculus, File Organization & Indexing, Transaction Management, Concurrency Control
  11. Paper 2 | Information Systems and Software Engineering: Fundamentals of Software Engineering, Software Requirements and Quality Assurance, Software Design, Estimation and Metrics, Software Testing, Software Maintenance and Configuration Management
  12. Paper 2 | Computer Networks: Introduction to CN, Data Communication, DLL: Access Control, DLL: Flow Control, DLL: Error Control, DLL: Framing, Data Link Layer - Ethernet, Net Layer: IPv4 & Proto, Net Layer: IP Addressing, Net Layer:Routing Protocol, Transport Layer Services, TL: Congestion & UDP, Application Layer, Hardware Basics
  13. Paper 2 | Internet & Web Technologies: Website, Browser & Services, Internet Fundamentals, Web Design & Development, Protocols & Services, Web Publishing & Hosting, Server Side & Security, Emerging Technologies, HTML Basics, JavaScript-Basics, CSS, XML, HTML5
  14. Paper 2 | Cyber Security And Emerging Technologies: Emerging Tech Trends, Internet of Things
  15. Paper 2 | Cloud Technology: Cloud Computing
  16. Paper 2 | Probability and statistics: Probability, Statistics
  17. Paper-1 English: Vocabulary, Preposition, Articles, Comprehension / Reading Comprehension / Unseen Passages (Critical Reasoning) (Paragraph Questions), Sentence Re-arrangements (Para Jumbles) (Narrative Sequencing), Sentence Correction (Error Correction), Sentence Completion (Fill in the blanks), Cloze Test (Cloze Passage), Sentence Construction
  18. Paper 1 General Mental Ability & Logical reasoning: Ratio and Proportion (Ratios), Divisibility Rules, Data Interpretation, Mixture and Alligation, Permutation and Combination, Logarithm, Number System, HCF LCM, Sequence and Series (Series), Speed Time and Distance, Series (Number and Letter Series) (Numerical Relations and Reasoning), Coding Decoding, Data Sufficiency, Non Verbal Reasoning (Spatial Aptitude) (Spatial Reasoning) (Visual Reasoning), Percentage, Average, Powers and Exponents (Surds and Indices), Algebra, Profit and Loss, Simple Interest and Compound Interest, Time and Work, Pipe and Cistern, Mensuration and Geometry, Mental Ability, Age Problems, Partnership, Arithmetic, Speed Mathematics and Basic Mathematics, Syllogisms, Deductive and Inductive Reasoning (Logical Deduction and Induction) (Prepositional Reasoning), Seating Arrangements, Blood Relations, Directions (Direction Test), Analytical Reasoning (Counting Figures Reasoning), Puzzle Solving (Puzzles), Calendar, Clock, Cubes & Dices, Selection Decision Table (Decision Making), Logical Sequence Of Words, Venn Diagram, Analogy
  19. Paper-1 General Knowledge & Current Affairs: State Wise GK, History, Geography, GK- Current Affairs, Static General Knowledge
  20. Full Length Mock Test:
AI summary & chapters

AI Summary

An AI-generated summary of this video lecture.

This short revision clip explains a current-affairs fact: NEEPCO commissioned a 5 MW grid-interactive solar photovoltaic power station at Monarchak in Tripura on 15 February 2015. The slide highlights the plant as the largest grid-interactive solar plant in the North-Eastern Region and uses a flow diagram to show how solar power works: Sunlight → Solar Panels → Direct Current → Inverter → Alternating Current → Power Grid. The instructor marks key phrases such as “grid-interactive solar photovoltaic power station” and the Hindi “5 मेगावट,” then underlines the concept that a solar photovoltaic plant converts sunlight directly into electricity. The lesson then shifts to an exam-trap comparison between Monarchak Solar and Monarchak Gas Plant, emphasizing that the solar station is 5 MW while the gas-based combined-cycle plant is about 101 MW, and that they should not be treated as the same generating unit. A fact table gives State: Tripura, District: Sepajhala, Capacity: 5 MW, Organisation: NEEPCO. The final revision slide states the expected answer is Tripura and identifies the project as the 5 MW Monarchak Solar Power Station.

Chapters

  1. 0:00 – 2:00 00:00-02:00

    The opening slide states that NEEPCO commissioned a 5 MW grid-interactive solar photovoltaic power station at Monarchak in Tripura on 15 February 2015. A right-side infographic titled “Largest Grid-interactive Solar Plant in North-Eastern Region” shows a Tripura map, a “5 MW Grid-Interactive Solar PV Plant” image, and a “Commissioned on 15 February 2015” badge. A flow strip titled “How Solar Power Works?” displays the chain Sunlight → Solar Panels → Direct Current → Inverter → Alternating Current → Power Grid. Red hand-drawn circles progressively mark “grid-interactive solar photovoltaic power station,” the Hindi “5 मेगावट,” and individual flow icons. The lower “Solar-Power Concept” block explains in English and Hindi that a solar photovoltaic plant converts sunlight directly into electricity, with red underlines appearing by the 65-second frame. The segment ends as the slide switches to “Monarchak Solar vs Monarchak Gas Plant,” circling the gas plant and contrasting a 5 MW solar station with an approximately 101 MW gas-based combined-cycle station.

  2. 2:00 – 2:45 02:00-02:45

    The comparison slide headed “Monarchak Solar vs Monarchak Gas Plant” shows a fact table listing State: Tripura, District: Sepajhala, Capacity: 5 MW, and Organisation: NEEPCO. A right-hand panel sets “Monarchak Solar” at 5 MW against “Monarchak Gas Plant” at ~101 MW, next to an “Exam Trap” box and the line “These should not be treated as the same generating unit.” Red handwritten marks circle table entries and add “= 5MW / 101” to stress the two distinct capacities. The later frames switch to a “Final Revision” slide stating that the expected answer is Tripura and that the associated project is the 5 MW Monarchak Solar Power Station.

The core teaching point is a single current-affairs fact with an attached conceptual explanation and an exam-trap warning. Students should remember: NEEPCO, 5 MW grid-interactive solar PV plant, Monarchak, Tripura, commissioned 15 February 2015. The “How Solar Power Works?” flow reinforces the PV conversion chain from sunlight to grid power via DC and an inverter. The most important revision cue is the distinction between Monarchak Solar (5 MW) and Monarchak Gas Plant (~101 MW); they are separate generating units despite sharing the Monarchak location. The final answer cue is Tripura, linked to the 5 MW Monarchak Solar Power Station.

Loading lesson…