2 men can do a work in 14 days. Then find how many men are required to finish…
TCS · 2025
2 men can do a work in 14 days. Then find how many men are required to finish the work in 4 days?
- A.
7
- B.
8
- C.
5
- D.
9
Attempted by 1197 students.
Sign up free to check your answer
Sign up freeLoading lesson…