Stop and Wait Protocol
Duration: 3 min
This video lesson is available to enrolled students.
Inside: a video lesson and guided study material.
Module outline
- General Intelligence & Reasoning: Analogy, Non Verbal Reasoning (Spatial Aptitude) (Spatial Reasoning) (Visual Reasoning), Series (Number and Letter Series) (Numerical Relations and Reasoning), Coding Decoding, Blood Relations, Directions (Direction Test), Ranking, Order and Sequence, Logical Sequence Of Words, Syllogisms, Venn Diagram, Deductive and Inductive Reasoning (Logical Deduction and Induction) (Prepositional Reasoning), Selection Decision Table (Decision Making), Data Sufficiency, Puzzle Solving (Puzzles), Data Arrangement, Cubes & Dices, Calendar, Clock, Arithmetic, Number System, HCF LCM, Verbal Analogy (Word Based Analogy), Visual Recognition and Figure Completion, Paper Folding and Cutting, Transformation of Shapes, Clocks and Calendars, Direction Sense, Cubes and Dice, Patterns in Two-Dimensional Figures, Seating Arrangements, Analogy and Classification, Logical Deduction and Induction, Alphabet and Word Tests, Mathematical Operations, Series Completion, Simplification and Approximation, Coding and Decoding, Numerical Reasoning, Assembling and Grouping of Shapes, Three-Dimensional Patterns and Visualization, Vocabulary, Number System, Averages, Mixtures and Alligation, Simple and Compound Interest, Percentages, Algebra, Speed, Time and Distance, Seating and Arrangement Puzzles, Traverse Surveying, Order, Ranking and Sequence, Constraint Puzzles, Syllogisms and Venn Diagrams, Reading Comprehension, Critical Reasoning, Permutations and Combinations, Narrative Sequencing, Project Monitoring, Resources and Safety, Profit, Loss and Discount, Ratio and Proportion, Time and Work, Mensuration, Data Interpretation, Powers, Surds and Logarithms, Sequences and Series, Articles and Determiners, Sentence Completion, Data Sufficiency, Blood Relations, Simple Interest and Compound Interest, Mixture and Alligation, Sequence and Series (Series), Speed Time and Distance, Algebra, Profit and Loss, Powers and Exponents (Surds and Indices), Permutation and Combination
- General Awareness: Physics, Chemistry, Biology, History, Geography, Polity, Indian Economy, Environment, Static General Knowledge, GK- Current Affairs, Artificial Intelligence, MS Office Applications, Terms & Abbreviations, Keyboard Shortcuts, Evolution of Indian Banking (Banking & Financial Awareness), Emerging Tech Trends
- Engineering Mathematics: Set Theory, Relations, Functions, Graph Theory, Group Theory, Propositional and Predicate Logic, Linear Algebra, Calculus, Probability, Statistics, Signal Space and Optimum Detection, Probability, Statistics
- Digital Logic: Digital Systems & Boolean Basics, Logic Gates & Hardware, Boolean Expression, Boolean Minimization, Combinational Circuit, Sequential Circuits, Number System, Number Representation, Floating Point Rep, Number Systems and Codes, Registers and Counters, Boolean Algebra and Logic Gates, Microprocessors and Microcontrollers, Logic Families and CMOS Logic, Microprocessors, Logic Gates and Boolean Algebra, Minimization of Boolean Functions, Timing, Hazards and Testing, Logic Families, Combinational Logic Design, Arithmetic Circuits, Waveform Generators and Timer Circuits, Semiconductor Memories and Programmable Logic Devices, Combinational Logic Circuits, Latches and Flip-Flops, Finite State Machines, Sequential Circuits and State Machines, Minimization of Boolean Functions, Arithmetic Circuits, Latches and Flip-Flops, Number Systems and Codes, Registers and Counters
- Computer Organisation & Architecture: Basics of COA, Cache Memory Organization, Input Output Organisation, Pipelining, Instr Formats & Modes, Control Unit Design, Programming the Basic Computer, Register Transfer and Microoperations, Semiconductor Memories and Programmable Logic, Processor Organization and Instructions, Memory Hierarchy and Input/Output, Registers and Counters
- Programming & Data Structures: C Fundamentals, Control Flow, Functions, Arrays & Pointers, Storage Classes, Structures & Enums, DMA, Macros, Scoping & File Handling, Introduction to DS, Array, Stack, Queue, Linked List, Tree, Graphs, Hashing, HTML Basics, OOPS with C++, Java, Object Oriented Technology
- Databases: Basics of DBMS, ER Diagram, Relational Model & Functional Dependencies, Keys & Integrity Constraints, Normalization (1NF - BCNF), Decomposition Properties & 4NF, File Organization & Indexing, Relational Algebra, SQL, Relational Calculus, Transaction Management, Concurrency Control, Database Recovery, Database Security & Authorization
- Algorithms: Algorithm Analysis, Time Complexity Analysis, Sorting Algorithms, Greedy Algorithms, Dynamic Programming, Minimum Spanning Trees, Shortest Path Algos
- Theory of Computation: Introduction to TOC, Deterministic FA (DFA), Non-Deterministic FA, Regular Expressions, Grammar, Regular Language Properties, Moore & Mealy Machines, Pushdown Automata & CFG, Turing Machines, Complexity Theory
- Compiler Design: Intro to Compilers, Lexical Analysis, Grammar & CFG, Syntax Analysis: Top-Down, Syntax Analysis: Bottom-Up, Semantic Analysis & SDT, Intermediate Code Gen, Code Optimization, Run Time Environment
- Operating System: Introduction to OS, Process Management, CPU Scheduling, Process Synchronization, Threads & Process Creation, Deadlock, Memory Management, Virtual Memory, Disc Scheduling, File Management, Security, Windows OS, Distributed Systems, Unix OS, Linux OS
- Computer Networks: Introduction to CN, DLL: Access Control, DLL: Flow Control, DLL: Error Control, DLL: Framing, Data Link Layer - Ethernet, Net Layer: IPv4 & Proto, Net Layer: IP Addressing, Net Layer:Routing Protocol, Transport Layer Services, TL: Congestion & UDP, Application Layer, Hardware Basics, Data Communication, Website, Browser & Services, Web Design & Development, Network Security, Cyber Threats and Malware Attacks, Cyber Safety and Security
- Full Length Mock Tests:
- Sectional Tests:
- Paper 2 - Full-length Mock Tests:
AI summary & chapters
AI Summary
An AI-generated summary of this video lecture.
This lecture introduces the Stop-and-Wait Protocol as a fundamental flow control mechanism in data communication. The instructor begins by establishing the problem of receiver overload, explaining that if frames arrive faster than they can be processed, storage becomes an issue. The core definition is presented: the sender transmits a single frame and then stops, waiting for an acknowledgment (ACK) from the receiver before proceeding. A timing diagram visually demonstrates this sequential exchange between Sender A and Receiver B, showing blue Frame blocks followed by orange ACK blocks. The instructor highlights the unidirectional nature of data transmission versus the auxiliary role of ACK tokens, emphasizing that this protocol effectively prevents buffer overflow by forcing the sender to slow down until confirmation is received.
Chapters
0:00 – 2:00 00:00-02:00
The lecture opens with the title "Stop-and-Wait Protocol" displayed on a whiteboard alongside numbered text points. The instructor explains the necessity of flow control, noting that if data frames arrive at the receiver site faster than they can be processed, storage is required. Visible text states that normally receivers do not have enough space to store these frames. To prevent the receiver from becoming overwhelmed, a mechanism is needed to tell the sender to slow down. The instructor defines the protocol explicitly: "The sender sends one frame, stops until it receives confirmation from the receiver... and then sends the next frame." A diagram begins to appear illustrating the sequence of Frames and ACKs traveling between Sender A and Receiver B over time, with the instructor gesturing towards the text to highlight specific steps.
2:00 – 3:22 02:00-03:22
The instructor elaborates on the timing diagram, which depicts Sender A and Receiver B exchanging blue "Frame" blocks and orange "ACK" blocks. Handwritten annotations like "RTT" appear on the timeline at the bottom of the diagram to indicate Round Trip Time. The visual aid emphasizes that while data frames are unidirectional, auxiliary ACK frames act as simple tokens of acknowledgment. The instructor gestures towards the sequence diagram to reinforce that the sender must wait for confirmation before transmitting subsequent data. This section solidifies the concept that flow control is achieved by stopping transmission after each frame until an acknowledgment confirms successful receipt, ensuring the receiver is not overwhelmed.
The Stop-and-Wait Protocol serves as a basic flow control method where the sender transmits one frame and waits for an acknowledgment before sending the next. This approach addresses the issue of receiver buffer overflow by ensuring that frames are not sent faster than they can be processed. The timing diagram clearly shows the alternating sequence of Frames and ACKs, with annotations like RTT indicating the time taken for a round trip. The protocol relies on unidirectional data flow supplemented by auxiliary ACK tokens, creating a simple yet effective mechanism for managing communication speed between Sender A and Receiver B.

