Stop and Wait Protocol

Duration: 3 min

This video lesson is available to enrolled students.

Return to /learn/RSSB-SENIOR-COMPUTER-INSTRUCTOR/paper-2-data-communication-and-network-security/dll-flow-control/basics-delay-analysis/asset-stop-and-wait-protocol after enrolling

Inside: a video lesson and guided study material.

Module outline

  1. About the Course: About the Course
  2. Paper-1 & 2 | Basic Numeracy: Ratio and Proportion (Ratios), Divisibility Rules, Mixture and Alligation, Permutation and Combination, Logarithm, Number System, HCF LCM, Sequence and Series (Series), Speed Time and Distance, Percentage, Average, Mensuration and Geometry, Age Problems, Arithmetic, Statistics, Probability, Profit and Loss, Simple Interest and Compound Interest, Partnership, Speed Mathematics and Basic Mathematics, Algebra, Powers and Exponents (Surds and Indices), Time and Work, Pipe and Cistern, RSSB Specific Videos - Basic Numeracy
  3. Paper-1 & 2 | Data Interpretation: Data Interpretation
  4. Paper-1 & 2 | General Mental Ability: Mental Ability, RSSB Specific Videos - Mental Ability
  5. Paper-1 & 2 | Logical Reasoning and Analytical Ability: Series (Number and Letter Series) (Numerical Relations and Reasoning), Coding Decoding, Data Sufficiency, Non Verbal Reasoning (Spatial Aptitude) (Spatial Reasoning) (Visual Reasoning), Syllogisms, Seating Arrangements, Blood Relations, Directions (Direction Test), Analytical Reasoning (Counting Figures Reasoning), Puzzle Solving (Puzzles), Calendar, Clock, Cubes & Dices, Venn Diagram, Analogy, Ranking, Order and Sequence, Deductive and Inductive Reasoning (Logical Deduction and Induction) (Prepositional Reasoning), Data Arrangement, Logical Sequence Of Words, Crypt Arithmetic
  6. Paper-1 & 2 | Decision Making and Problem Solving: Selection Decision Table (Decision Making)
  7. Paper-1 | General Science: Physics, Biology, Chemistry, RSSB Specific Videos
  8. Paper-1 | General Awareness: State Wise GK, GK- Current Affairs
  9. Paper-2 | Fundamentals of Computer: Basics of COA, Number System, Floating Point Rep, Number Representation
  10. Paper - 2 | Digital Logic Systems: Digital Systems & Boolean Basics, Logic Gates & Hardware, Boolean Expression, Boolean Minimization, Combinational Circuit, Sequential Circuits
  11. Paper-2 | Operating Systems: Introduction to OS, Process Management, CPU Scheduling, Process Synchronization, Deadlock, Threads & Process Creation, Memory Management, Virtual Memory, Disc Scheduling, File Management, Linux OS, Distributed Systems
  12. Paper-2 | Database Management System: Basics of DBMS, ER Diagram, Relational Model & Functional Dependencies, Keys & Integrity Constraints, Normalization (1NF - BCNF), Decomposition Properties & 4NF, Relational Algebra, SQL, Relational Calculus, File Organization & Indexing, Transaction Management, Concurrency Control
  13. Paper-2 | Data Structures: Introduction to DS, Array, Stack, Queue, Linked List, Tree, Graphs, Hashing
  14. Paper-2 | C Programming: C Fundamentals, Control Flow, Functions, Arrays & Pointers, Storage Classes, Structures & Enums, DMA, Macros, Scoping & File Handling
  15. Paper 2 | Oops, C++, Java: Language Design, OOPS with C++, Java, .Net Programming, Java Fundamentals
  16. Paper 2 | Python: Introduction to Python, Tokens, Variables, Data Types, I/O, Operators & Expressions, Control Flow & Looping, Collections & Strings, Functions & Modules, File Handling & Data Analysis
  17. Paper 2 | Emerging Trends and AI: Emerging Tech Trends, Artificial Intelligence
  18. Paper-2 | Algorithms: Algorithm Analysis, Time Complexity Analysis, Sorting Algorithms, Greedy Algorithms, Advanced Algorithms
  19. Paper 2 | Data Communication and Network Security: Introduction to CN, Data Communication, DLL: Access Control, DLL: Flow Control, DLL: Error Control, Data Link Layer - Ethernet, Net Layer: IPv4 & Proto, Net Layer: IP Addressing, Net Layer:Routing Protocol, Transport Layer Services, TL: Congestion & UDP, Application Layer, Hardware basics, Network Security, Ethical Hacking
  20. Paper-2 I Software Engineering: Fundamentals of Software Engineering, Software Requirements and Quality Assurance, Software Design, Estimation and Metrics, Software Testing, Software Maintenance and Configuration Management
  21. Paper-2 | Computer Organization and Architecture: Cache Memory Organization, Input Output Organisation, Instr Formats & Modes, Control Unit Design, Register Transfer and Microoperations
  22. Paper-2 | Web Development: JavaScript-Basics, HTML Basics, CSS, XML
  23. Pedagogy: Child Development, Concept of Pedagogy, Psychology, Theories, Inclusive Education, Experiential Pedagogy, Curriculum Framework & Reforms, National Education Policy (NEP) 2020
  24. Live Sessions: RSSB Live Sessions
  25. RSSB Paper 1 - Full Mock Tests:
  26. RSSB Paper 2 - Full Mock Tests:
  27. SCI Previous Year Papers:
AI summary & chapters

AI Summary

An AI-generated summary of this video lecture.

This lecture introduces the Stop-and-Wait Protocol as a fundamental flow control mechanism in data communication. The instructor begins by establishing the problem of receiver overload, explaining that if frames arrive faster than they can be processed, storage becomes an issue. The core definition is presented: the sender transmits a single frame and then stops, waiting for an acknowledgment (ACK) from the receiver before proceeding. A timing diagram visually demonstrates this sequential exchange between Sender A and Receiver B, showing blue Frame blocks followed by orange ACK blocks. The instructor highlights the unidirectional nature of data transmission versus the auxiliary role of ACK tokens, emphasizing that this protocol effectively prevents buffer overflow by forcing the sender to slow down until confirmation is received.

Chapters

  1. 0:00 – 2:00 00:00-02:00

    The lecture opens with the title "Stop-and-Wait Protocol" displayed on a whiteboard alongside numbered text points. The instructor explains the necessity of flow control, noting that if data frames arrive at the receiver site faster than they can be processed, storage is required. Visible text states that normally receivers do not have enough space to store these frames. To prevent the receiver from becoming overwhelmed, a mechanism is needed to tell the sender to slow down. The instructor defines the protocol explicitly: "The sender sends one frame, stops until it receives confirmation from the receiver... and then sends the next frame." A diagram begins to appear illustrating the sequence of Frames and ACKs traveling between Sender A and Receiver B over time, with the instructor gesturing towards the text to highlight specific steps.

  2. 2:00 – 3:22 02:00-03:22

    The instructor elaborates on the timing diagram, which depicts Sender A and Receiver B exchanging blue "Frame" blocks and orange "ACK" blocks. Handwritten annotations like "RTT" appear on the timeline at the bottom of the diagram to indicate Round Trip Time. The visual aid emphasizes that while data frames are unidirectional, auxiliary ACK frames act as simple tokens of acknowledgment. The instructor gestures towards the sequence diagram to reinforce that the sender must wait for confirmation before transmitting subsequent data. This section solidifies the concept that flow control is achieved by stopping transmission after each frame until an acknowledgment confirms successful receipt, ensuring the receiver is not overwhelmed.

The Stop-and-Wait Protocol serves as a basic flow control method where the sender transmits one frame and waits for an acknowledgment before sending the next. This approach addresses the issue of receiver buffer overflow by ensuring that frames are not sent faster than they can be processed. The timing diagram clearly shows the alternating sequence of Frames and ACKs, with annotations like RTT indicating the time taken for a round trip. The protocol relies on unidirectional data flow supplemented by auxiliary ACK tokens, creating a simple yet effective mechanism for managing communication speed between Sender A and Receiver B.

Loading lesson…