Station A uses 32 byte packets to transmit messages to Station B using a…

PYQ RPSC Programmer 2011

Station A uses 32 byte packets to transmit messages to Station B using a sliding window protocol. The round trip delay between A and B is 80 milliseconds and the bottleneck bandwidth on the path between A and B is 128 kbps. What is the optimal window size that A should use?

  1. A.

    20

  2. B.

    40

  3. C.

    160

  4. D.

    320

Attempted by 3 students.

Sign up free to check your answer

Sign up free

Explore the full course: Rpsc Programmer

Loading lesson…