Stop and Wait Protocol
Duration: 3 min
This video lesson is available to enrolled students.
Inside: a video lesson and guided study material.
Module outline
- Paper 1 | Reasoning Test: Series (Number and Letter Series) (Numerical Relations and Reasoning), Coding Decoding, Data Sufficiency, Syllogisms, Deductive and Inductive Reasoning (Logical Deduction and Induction) (Prepositional Reasoning), Seating Arrangements, Blood Relations, Puzzle Solving (Puzzles), Venn Diagram, Analogy, Ranking, Order and Sequence, Non Verbal Reasoning (Spatial Aptitude) (Spatial Reasoning) (Visual Reasoning), Selection Decision Table (Decision Making), Logical Sequence Of Words, Cubes & Dices, Analytical Reasoning (Counting Figures Reasoning), Calendar, Alphabet and Word Tests, Numerical Reasoning, Number System, Averages, Mixtures and Alligation, Percentages, Series Completion, Analogy and Classification, Patterns in Two-Dimensional Figures, Coding and Decoding, Mathematical Operations, Direction Sense, Algebra, Logical Deduction and Induction, Syllogisms and Venn Diagrams, Critical Reasoning, Order, Ranking and Sequence, Reading Comprehension, Profit, Loss and Discount, Constraint Puzzles, Speed, Time and Distance, Traverse Surveying, Ratio and Proportion, Time and Work, Mensuration, Permutations and Combinations, Clocks and Calendars, Data Interpretation, Assembling and Grouping of Shapes, Transformation of Shapes, Three-Dimensional Patterns and Visualization, Cubes and Dice, Vocabulary, Blood Relations, Data Sufficiency
- Paper 1 | Numerical Analysis: Number System, HCF LCM, Percentage, Ratio and Proportion (Ratios), Average, Sequence and Series (Series), Powers and Exponents (Surds and Indices), Algebra, Statistics, Data Interpretation, Mental Ability, Arithmetic, Logarithm, Profit and Loss, Simple Interest and Compound Interest, Speed Time and Distance, Mixture and Alligation, Mensuration and Geometry, Permutation and Combination, Probability, Sequences and Series, Powers, Surds and Logarithms, Subject-Verb Agreement, Sentence Completion, Geometry, Sentence Structure and Correction, Data Sufficiency, Trigonometry, Measurement and Quantity Take-Off, Signal Space and Optimum Detection, Probability, Statistics, Algebra, Time and Work, Speed, Time and Distance, Data Interpretation, Graph Theory, Combinatorics
- Paper 1 | General Knowledge: State Wise GK, History, Geography, GK- Current Affairs, Static General Knowledge, Polity, Indian Economy
- Paper 1 | DBMS: Basics of DBMS, ER Diagram, Relational Model & Functional Dependencies, Keys & Integrity Constraints, Normalization (1NF - BCNF), Decomposition Properties & 4NF, File Organization & Indexing, Relational Algebra, SQL, Transaction Management, Concurrency Control, Relational Calculus, Database Security & Authorization, Database Recovery
- Paper 1 | Data Communication & Network: Introduction to CN, Data Communication, DLL: Access Control, DLL: Flow Control, DLL: Error Control, DLL: Framing, Data Link Layer - Ethernet, Net Layer: IPv4 & Proto, Net Layer: IP Addressing, Net Layer:Routing Protocol, Transport Layer Services, TL: Congestion & UDP, Application Layer, Network Security, Security in Mobile and Wireless Computing, Input Output Organisation, File Management, Hardware Basics, Terms & Abbreviations, Protocols & Services, Network Access Technologies, Cyber Safety and Security, Basics of COA
- Paper 2 | System Analysis & Design: Fundamentals of Systems and Information Systems, SDLC and Development Approaches, Fundamentals of Software Engineering, Software Requirements and Quality Assurance, Software Documentation and Software Requirements Specification (SRS), SDD and Quality Assurance, Software Design, Estimation and Metrics, Software Testing, Software Maintenance and Configuration Management, Security, Risk Management & Maintenance, extras
- Paper 2 | Programming Language (Java): Java Fundamentals, OOPS with Java, Array, String, IO & References, Generic & Collections, Multithreading, Java, Miscellaneous, Control Flow, OOPS with C++, Stack, C Fundamentals, Arrays & Pointers, Object Oriented Technology, Control Flow & Looping, Introduction to Python
AI summary & chapters
AI Summary
An AI-generated summary of this video lecture.
This lecture introduces the Stop-and-Wait Protocol as a fundamental flow control mechanism in data communication. The instructor begins by establishing the problem of receiver overload, explaining that if frames arrive faster than they can be processed, storage becomes an issue. The core definition is presented: the sender transmits a single frame and then stops, waiting for an acknowledgment (ACK) from the receiver before proceeding. A timing diagram visually demonstrates this sequential exchange between Sender A and Receiver B, showing blue Frame blocks followed by orange ACK blocks. The instructor highlights the unidirectional nature of data transmission versus the auxiliary role of ACK tokens, emphasizing that this protocol effectively prevents buffer overflow by forcing the sender to slow down until confirmation is received.
Chapters
0:00 – 2:00 00:00-02:00
The lecture opens with the title "Stop-and-Wait Protocol" displayed on a whiteboard alongside numbered text points. The instructor explains the necessity of flow control, noting that if data frames arrive at the receiver site faster than they can be processed, storage is required. Visible text states that normally receivers do not have enough space to store these frames. To prevent the receiver from becoming overwhelmed, a mechanism is needed to tell the sender to slow down. The instructor defines the protocol explicitly: "The sender sends one frame, stops until it receives confirmation from the receiver... and then sends the next frame." A diagram begins to appear illustrating the sequence of Frames and ACKs traveling between Sender A and Receiver B over time, with the instructor gesturing towards the text to highlight specific steps.
2:00 – 3:22 02:00-03:22
The instructor elaborates on the timing diagram, which depicts Sender A and Receiver B exchanging blue "Frame" blocks and orange "ACK" blocks. Handwritten annotations like "RTT" appear on the timeline at the bottom of the diagram to indicate Round Trip Time. The visual aid emphasizes that while data frames are unidirectional, auxiliary ACK frames act as simple tokens of acknowledgment. The instructor gestures towards the sequence diagram to reinforce that the sender must wait for confirmation before transmitting subsequent data. This section solidifies the concept that flow control is achieved by stopping transmission after each frame until an acknowledgment confirms successful receipt, ensuring the receiver is not overwhelmed.
The Stop-and-Wait Protocol serves as a basic flow control method where the sender transmits one frame and waits for an acknowledgment before sending the next. This approach addresses the issue of receiver buffer overflow by ensuring that frames are not sent faster than they can be processed. The timing diagram clearly shows the alternating sequence of Frames and ACKs, with annotations like RTT indicating the time taken for a round trip. The protocol relies on unidirectional data flow supplemented by auxiliary ACK tokens, creating a simple yet effective mechanism for managing communication speed between Sender A and Receiver B.

