PYQ Questions
This video lesson is available to enrolled students.
Return to /learn/NIACL-AO-IT-SPECIALIST/data-communication-networking-it-specialist/dll-flow-control/basics-delay-analysis/pyq-questions after enrolling
Inside: a video lesson and guided study material.
Module outline
- Quantitative Aptitude: Ratio and Proportion (Ratios), Data Interpretation, Mixture and Alligation, Permutation and Combination, Number System, Sequence and Series (Series), Speed Time and Distance, Speed Mathematics and Basic Mathematics, Algebra, Percentage, Profit and Loss, Simple Interest and Compound Interest, Powers and Exponents (Surds and Indices), Time and Work, Mensuration and Geometry, Partnership
- Reasoning Ability: Series (Number and Letter Series) (Numerical Relations and Reasoning), Coding Decoding, Data Sufficiency, Seating Arrangements, Deductive and Inductive Reasoning (Logical Deduction and Induction) (Prepositional Reasoning), Directions (Direction Test), Ranking, Order and Sequence, Syllogisms, Blood Relations, Puzzle Solving (Puzzles), Inequality, Machine Input-Output
- English Language: Vocabulary, Noun, Subject Verb Agreement (Verb Noun Agreement), Adjectives, Tenses, Comprehension / Reading Comprehension / Unseen Passages (Critical Reasoning) (Paragraph Questions), Cloze Test (Cloze Passage), Sentence Correction (Error Correction), Sentence Completion (Fill in the blanks), Sentence Re-arrangements (Para Jumbles) (Narrative Sequencing), Sentence Construction, Pronoun, Preposition, Conjunction, Adverb, Verb, Modals, Articles
- General Awareness: Evolution of Indian Banking (Banking & Financial Awareness), GK- Current Affairs, Static General Knowledge, Indian Economy
- C Concepts + MCQs (IT Specialist): C Programming by Yash Sir, C Language Core
- Java (IT Specialist): Java
- Python (IT Specialist): Python for Placements by Yash Sir, Python Basics
- OOPs (IT Specialist): Object Oriented Programming (OOPS)
- DBMS (IT Specialist): Basics of DBMS, ER Diagram, Relational Model & Functional Dependencies, Keys & Integrity Constraints, Normalization (1NF - BCNF), Decomposition Properties & 4NF, File Organization & Indexing, Relational Algebra, Relational Calculus, Transaction Management, Concurrency Control, Database Recovery, ORDBMS, Database Security & Authorization, Query Processing & Optimization, Enhanced Data Models, Data Warehousing & Mining, Big Data Systems, NoSQL
- SQL (IT Specialist): SQL
- Software Engineering (IT Specialist): Fundamentals of Software Engineering, Software Requirements and Quality Assurance, Software Design, Estimation and Metrics, Software Testing, Software Maintenance and Configuration Management
- Data Structure (IT Specialist): Introduction to DS, Array, Stack, Queue, Linked List, Tree, Graphs, Hashing
- Operating System (IT Specialist): Introduction to OS, Process Management, CPU Scheduling, Process Synchronization, Deadlock, Threads & Process Creation, Memory Management, Virtual Memory, Disc Scheduling, File Management, Windows OS, Linux OS, Security, Distributed Systems, Virtual Machines
- Compiler Design (IT Specialist): Intro to Compilers, Lexical Analysis, Grammar & CFG, Syntax Analysis: Top-Down, Syntax Analysis: Bottom-Up, Semantic Analysis & SDT, Intermediate Code Gen, Code Optimization, Run Time Environment
- Computer Architecture (IT Specialist): Basics of COA, Floating Point Rep, Cache Memory Organization, Input Output Organisation, Pipelining, Instr Formats & Modes, Control Unit Design, Register Transfer and Microoperations, Multiprocessors, Programming the Basic Computer
- Data Communication & Networking (IT Specialist): Introduction to CN, Data Communication, DLL: Access Control, DLL: Flow Control, DLL: Error Control, DLL: Framing, Data Link Layer - Ethernet, Net Layer: IPv4 & Proto, Net Layer: IP Addressing, Net Layer:Routing Protocol, Transport Layer Services, TL: Congestion & UDP, Application Layer, Hardware basics, Network Security
- Descriptive Test (Main Exam): English Writing Ability
Loading lesson…

