PYQ Questions

This video lesson is available to enrolled students.

Return to /learn/MPPSC-ASSISTANT-PROFESSOR-COMPUTER-SCIENCE-PAPER-2/computer-network-and-information-security/dll-flow-control/basics-delay-analysis/pyq-questions after enrolling

Inside: a video lesson and guided study material.

Module outline

  1. About Course: About the Course
  2. Paper 1 | General Studies: State Wise GK
  3. Paper 1 | Information and Communication Technology: Role of Internet and Web Services, Security in Mobile and Wireless Computing
  4. Paper 1 | Current Affairs: GK- Current Affairs
  5. Paper 2 | Discrete Mathematical Structure: Digital Systems & Boolean Basics, Logic Gates & Hardware, Boolean Expression, Boolean Minimization, Set Theory, Relations, Functions, Graph Theory, Group Theory, Propositional and Predicate Logic, Probability
  6. Paper 2 | Digital Computer Organization And Architecture: Number System, Number Representation, Sequential Circuits, Combinational Circuit, Basics of COA, Floating Point Rep, Cache Memory Organization, Input Output Organisation, Pipelining, Instr Formats & Modes, Register Transfer and Microoperations, Control Unit Design, Programming the Basic Computer
  7. Paper 2 | C Programming: C Fundamentals, Control Flow, Functions, Arrays & Pointers, Storage Classes, Structures & Enums, DMA, Macros, Scoping & File Handling
  8. Paper 2 | Programming Languages & Object-Oriented Programming Concepts: Java, OOPS with C++, Java Fundamentals, Array, String, IO & References
  9. Paper 2 | Python: Introduction to Python, Tokens, Variables, Data Types, I/O, Operators & Expressions, Control Flow & Looping, Collections & Strings, Functions & Modules, File Handling & Data Analysis
  10. Paper 2 | Data Structure And Algorithms: Introduction to DS, Array, Stack, Queue, Linked List, Tree, Graphs, Hashing, Algorithm Analysis, Time Complexity Analysis, Sorting Algorithms, Greedy Algorithms, Minimum Spanning Trees, Advanced Algorithms
  11. Paper 2 | Operating System: Introduction to OS, Process Management, CPU Scheduling, Process Synchronization, Deadlock, Threads & Process Creation, Memory Management, Virtual Memory, Disc Scheduling, File Management, Unix OS
  12. Paper 2 | Theory Of Computation: Introduction to TOC, Deterministic FA (DFA), Non-Deterministic FA, Regular Expressions, Grammar, Regular Language Properties, Moore & Mealy Machines, Pushdown Automata & CFG, Turing Machines, Complexity Theory
  13. Paper 2 | Compiler Design: Intro to Compilers, Lexical Analysis, Grammar & CFG, Syntax Analysis: Top-Down, Syntax Analysis: Bottom-Up, Semantic Analysis & SDT, Intermediate Code Gen, Code Optimization, Run Time Environment
  14. Paper 2 | Database Management System: Basics of DBMS, ER Diagram, Relational Model & Functional Dependencies, Keys & Integrity Constraints, Normalization (1NF - BCNF), Decomposition Properties & 4NF, Relational Algebra, SQL, Transaction Management, Concurrency Control, Database Recovery, Database Security & Authorization, Enhanced Data Models
  15. Paper 2 | Computer Network And Information Security: Introduction to CN, Data Communication, Application Layer, Hardware basics, Cyber Threats and Malware Attacks, Network Security, DLL: Access Control, DLL: Flow Control, DLL: Error Control, DLL: Framing, Data Link Layer - Ethernet, Net Layer: IPv4 & Proto, Net Layer: IP Addressing, Net Layer:Routing Protocol, Transport Layer Services, TL: Congestion & UDP
  16. Paper 2 | Software Engineering: Fundamentals of Software Engineering, Software Requirements and Quality Assurance, Software Design, Estimation and Metrics, Software Testing, Software Maintenance and Configuration Management
  17. Paper 2 | Current Trends & Technologies: Emerging Tech Trends, Approaches to AI, Search Algorithms, Game Playing, Knowledge Representation, Planning, Multi Agent Systems, Fuzzy Sets, Natural Language Processing, Artificial Neural Networks, Genetic Algorithms, Artificial Intelligence, Data Warehousing & Mining, Electronic Data Interchange and E-Commerce, Terms & Abbreviations
  18. Paper 2 | Full Length Mock Tests:
Loading lesson…