Stop and Wait Protocol

Duration: 3 min

This video lesson is available to enrolled students.

Return to /learn/MCA-ENTRANCE-EXAM/computer-networks/dll-flow-control/basics-delay-analysis/asset-stop-and-wait-protocol after enrolling

Inside: a video lesson and guided study material.

Module outline

  1. Quantitative Aptitude and Math: Ratio and Proportion (Ratios), Divisibility Rules, Data Interpretation, Permutation and Combination, Logarithm, Number System, HCF LCM, Sequence and Series (Series), Speed Time and Distance, Algebra, Powers and Exponents (Surds and Indices), Arithmetic, Mensuration and Geometry, Statistics, Probability, Percentage, Profit and Loss, Simple Interest and Compound Interest, Time and Work, Average, Calculus, Trigonometry, Vectors, Linear Algebra
  2. Logical and Analytical Reasoning: Series (Number and Letter Series) (Numerical Relations and Reasoning), Coding Decoding, Data Sufficiency, Non Verbal Reasoning (Spatial Aptitude) (Spatial Reasoning) (Visual Reasoning), Analogy, Verbal Analogy (Word Based Analogy), Directions (Direction Test), Blood Relations, Ranking, Order and Sequence, Syllogisms, Deductive and Inductive Reasoning (Logical Deduction and Induction) (Prepositional Reasoning), Seating Arrangements, Puzzle Solving (Puzzles), Cubes & Dices, Analytical Reasoning (Counting Figures Reasoning)
  3. English Language & Comprehension: Vocabulary, Subject Verb Agreement (Verb Noun Agreement), Tenses, Verb, Articles, Preposition, Pronoun, Conjunction, Sentence Correction (Error Correction), Comprehension / Reading Comprehension / Unseen Passages (Critical Reasoning) (Paragraph Questions), Sentence Completion (Fill in the blanks), Sentence Construction, Sentence Re-arrangements (Para Jumbles) (Narrative Sequencing), Cloze Test (Cloze Passage)
  4. Computer Architecture: Basics of COA, Floating Point Rep, Cache Memory Organization, Input Output Organisation, Pipelining, Instr Formats & Modes, Control Unit Design, Register Transfer and Microoperations, Multiprocessors, Programming the Basic Computer
  5. Digital Electronics: Digital Systems & Boolean Basics, Logic Gates & Hardware, Boolean Expression, Boolean Minimization, Combinational Circuit, Sequential Circuits, Number System, Number Representation
  6. Operating System: Introduction to OS, Process Management, CPU Scheduling, Process Synchronization, Deadlock, Threads & Process Creation, Memory Management, Virtual Memory, Disc Scheduling, File Management, Windows OS, Linux OS, Security, Distributed Systems, Virtual Machines
  7. Computer Networks: Introduction to CN, Data Communication, DLL: Access Control, DLL: Flow Control, DLL: Error Control, DLL: Framing, Data Link Layer - Ethernet, Net Layer: IPv4 & Proto, Net Layer: IP Addressing, Net Layer:Routing Protocol, TL: Congestion & UDP, Application Layer, Hardware basics, Network Security, Cyber and Info Security
  8. Data Structures: Introduction to DS, Array, Stack, Queue, Linked List, Tree, Graphs, Hashing
  9. Algorithms: Algorithm Analysis, Sorting Algorithms, Greedy Algorithms, Dynamic Programming, Minimum Spanning Trees, Shortest Path Algos, Time Complexity Analysis, Advanced Algorithms
  10. Software Engineering: Fundamentals of Software Engineering, Software Requirements and Quality Assurance, Software Design, Estimation and Metrics, Software Testing, Software Maintenance and Configuration Management
  11. DBMS: Basics of DBMS, ER Diagram, Relational Model & Functional Dependencies, Keys & Integrity Constraints, Normalization (1NF - BCNF), Decomposition Properties & 4NF, File Organization & Indexing, Relational Algebra, SQL, Relational Calculus, Transaction Management, Concurrency Control, Database Recovery, ORDBMS, Database Security & Authorization, Query Processing & Optimization, Enhanced Data Models, Data Warehousing & Mining, Big Data Systems, NoSQL
AI summary & chapters

AI Summary

An AI-generated summary of this video lecture.

This lecture introduces the Stop-and-Wait Protocol as a fundamental flow control mechanism in data communication. The instructor begins by establishing the problem of receiver overload, explaining that if frames arrive faster than they can be processed, storage becomes an issue. The core definition is presented: the sender transmits a single frame and then stops, waiting for an acknowledgment (ACK) from the receiver before proceeding. A timing diagram visually demonstrates this sequential exchange between Sender A and Receiver B, showing blue Frame blocks followed by orange ACK blocks. The instructor highlights the unidirectional nature of data transmission versus the auxiliary role of ACK tokens, emphasizing that this protocol effectively prevents buffer overflow by forcing the sender to slow down until confirmation is received.

Chapters

  1. 0:00 – 2:00 00:00-02:00

    The lecture opens with the title "Stop-and-Wait Protocol" displayed on a whiteboard alongside numbered text points. The instructor explains the necessity of flow control, noting that if data frames arrive at the receiver site faster than they can be processed, storage is required. Visible text states that normally receivers do not have enough space to store these frames. To prevent the receiver from becoming overwhelmed, a mechanism is needed to tell the sender to slow down. The instructor defines the protocol explicitly: "The sender sends one frame, stops until it receives confirmation from the receiver... and then sends the next frame." A diagram begins to appear illustrating the sequence of Frames and ACKs traveling between Sender A and Receiver B over time, with the instructor gesturing towards the text to highlight specific steps.

  2. 2:00 – 3:22 02:00-03:22

    The instructor elaborates on the timing diagram, which depicts Sender A and Receiver B exchanging blue "Frame" blocks and orange "ACK" blocks. Handwritten annotations like "RTT" appear on the timeline at the bottom of the diagram to indicate Round Trip Time. The visual aid emphasizes that while data frames are unidirectional, auxiliary ACK frames act as simple tokens of acknowledgment. The instructor gestures towards the sequence diagram to reinforce that the sender must wait for confirmation before transmitting subsequent data. This section solidifies the concept that flow control is achieved by stopping transmission after each frame until an acknowledgment confirms successful receipt, ensuring the receiver is not overwhelmed.

The Stop-and-Wait Protocol serves as a basic flow control method where the sender transmits one frame and waits for an acknowledgment before sending the next. This approach addresses the issue of receiver buffer overflow by ensuring that frames are not sent faster than they can be processed. The timing diagram clearly shows the alternating sequence of Frames and ACKs, with annotations like RTT indicating the time taken for a round trip. The protocol relies on unidirectional data flow supplemented by auxiliary ACK tokens, creating a simple yet effective mechanism for managing communication speed between Sender A and Receiver B.

Loading lesson…