Job Scheduling Problem

Duration: 7 min

This video lesson is available to enrolled students.

Return to /learn/MCA-ENTRANCE-EXAM/algorithms/greedy-algorithms/job-activity-selection/asset-job-scheduling-problem after enrolling

Inside: a video lesson and guided study material.

Module outline

  1. Quantitative Aptitude and Math: Ratio and Proportion (Ratios), Divisibility Rules, Data Interpretation, Permutation and Combination, Logarithm, Number System, HCF LCM, Sequence and Series (Series), Speed Time and Distance, Algebra, Powers and Exponents (Surds and Indices), Arithmetic, Mensuration and Geometry, Statistics, Probability, Percentage, Profit and Loss, Simple Interest and Compound Interest, Time and Work, Average, Calculus, Trigonometry, Vectors, Linear Algebra
  2. Logical and Analytical Reasoning: Series (Number and Letter Series) (Numerical Relations and Reasoning), Coding Decoding, Data Sufficiency, Non Verbal Reasoning (Spatial Aptitude) (Spatial Reasoning) (Visual Reasoning), Analogy, Verbal Analogy (Word Based Analogy), Directions (Direction Test), Blood Relations, Ranking, Order and Sequence, Syllogisms, Deductive and Inductive Reasoning (Logical Deduction and Induction) (Prepositional Reasoning), Seating Arrangements, Puzzle Solving (Puzzles), Cubes & Dices, Analytical Reasoning (Counting Figures Reasoning)
  3. English Language & Comprehension: Vocabulary, Subject Verb Agreement (Verb Noun Agreement), Tenses, Verb, Articles, Preposition, Pronoun, Conjunction, Sentence Correction (Error Correction), Comprehension / Reading Comprehension / Unseen Passages (Critical Reasoning) (Paragraph Questions), Sentence Completion (Fill in the blanks), Sentence Construction, Sentence Re-arrangements (Para Jumbles) (Narrative Sequencing), Cloze Test (Cloze Passage)
  4. Computer Architecture: Basics of COA, Floating Point Rep, Cache Memory Organization, Input Output Organisation, Pipelining, Instr Formats & Modes, Control Unit Design, Register Transfer and Microoperations, Multiprocessors, Programming the Basic Computer
  5. Digital Electronics: Digital Systems & Boolean Basics, Logic Gates & Hardware, Boolean Expression, Boolean Minimization, Combinational Circuit, Sequential Circuits, Number System, Number Representation
  6. Operating System: Introduction to OS, Process Management, CPU Scheduling, Process Synchronization, Deadlock, Threads & Process Creation, Memory Management, Virtual Memory, Disc Scheduling, File Management, Windows OS, Linux OS, Security, Distributed Systems, Virtual Machines
  7. Computer Networks: Introduction to CN, Data Communication, DLL: Access Control, DLL: Flow Control, DLL: Error Control, DLL: Framing, Data Link Layer - Ethernet, Net Layer: IPv4 & Proto, Net Layer: IP Addressing, Net Layer:Routing Protocol, TL: Congestion & UDP, Application Layer, Hardware basics, Network Security, Cyber and Info Security
  8. Data Structures: Introduction to DS, Array, Stack, Queue, Linked List, Tree, Graphs, Hashing
  9. Algorithms: Algorithm Analysis, Sorting Algorithms, Greedy Algorithms, Dynamic Programming, Minimum Spanning Trees, Shortest Path Algos, Time Complexity Analysis, Advanced Algorithms
  10. Software Engineering: Fundamentals of Software Engineering, Software Requirements and Quality Assurance, Software Design, Estimation and Metrics, Software Testing, Software Maintenance and Configuration Management
  11. DBMS: Basics of DBMS, ER Diagram, Relational Model & Functional Dependencies, Keys & Integrity Constraints, Normalization (1NF - BCNF), Decomposition Properties & 4NF, File Organization & Indexing, Relational Algebra, SQL, Relational Calculus, Transaction Management, Concurrency Control, Database Recovery, ORDBMS, Database Security & Authorization, Query Processing & Optimization, Enhanced Data Models, Data Warehousing & Mining, Big Data Systems, NoSQL
AI summary & chapters

AI Summary

An AI-generated summary of this video lecture.

The video lecture introduces the Job Scheduling Problem, a classic optimization problem in computer science. The instructor begins by defining the problem parameters on a slide: a single CPU, non-primitive scheduling, and n-jobs where each job has an arrival time of 0, a burst time of 1, a deadline Di, and a profit Pi. The objective is to select a subset of jobs that can be completed within their deadlines to maximize total profit. A visual chart titled '10X10 Job Shop Scheduling Problem' is displayed to illustrate an unconstrained schedule. The lecture then transitions to a specific numerical example from a GATE 2005 exam question involving 9 tasks (T1 to T9). The instructor demonstrates a greedy algorithm approach, drawing a timeline and filling slots with tasks based on their profits and deadlines to determine the optimal schedule and identify which tasks must be left out.

Chapters

  1. 0:00 – 2:00 00:00-02:00

    The instructor presents the problem definition on a slide titled 'Job scheduling problem'. He highlights key constraints: 'single CPU with Non-Primitive Scheduling and n-jobs'. He specifies that 'arrival time is 0, burst time of each job requirement is 1'. The goal is to 'Select a Subset of 'n' jobs, such that, the jobs in the subset can be completed with in the deadline and generate Max profit.' A chart labeled '10X10 Job Shop Scheduling Problem' shows colored bars representing an 'Unconstrained Schedule'. The instructor underlines 'Non-Primitive Scheduling' and circles 'deadline Di'. He writes 'J1 -> S' on the screen, indicating the mapping of a job to a time slot. The slide also mentions 'Knowledge Gate Educator' and 'Sanchit Jain Sir' in the bottom left corner.

  2. 2:00 – 5:00 02:00-05:00

    The slide changes to a specific problem statement: 'Q. We are given 9 tasks T1, T2... T9.' A table lists tasks, profits, and deadlines. For example, T3 has profit 30 and deadline 5. T1 has profit 15 and deadline 7. The question asks, 'Are all tasks completed in the schedule that gives maximum profit? (Gate-2005) (2 Marks)'. Four options are provided: (A) All tasks are completed, (B) T1 and T6 are left out, (C) T1 and T8 are left out, (D) T4 and T6 are left out. The instructor draws a timeline with 9 boxes labeled 1 through 9. He begins solving by writing 'T3' into slot 3, as it has the highest profit (30) and a deadline of 5. He then writes 'T7' into slot 2 (profit 23, deadline 2).

  3. 5:00 – 6:50 05:00-06:50

    The instructor continues filling the timeline to construct the optimal schedule. He writes 'T9' (profit 25, deadline 3) into slot 1. He places 'T2' (profit 20, deadline 2) into slot 2, but then adjusts. Looking at the final board state, the slots are filled as: Slot 1 with T2, Slot 2 with T7, Slot 3 with T9, Slot 4 with T5, Slot 5 with T3, Slot 6 with T1, and Slot 7 with T8. This arrangement satisfies all deadlines. The tasks T4 and T6 are not placed in any slot. The instructor concludes that T4 and T6 are the tasks left out, corresponding to option (D). The board shows the final schedule clearly.

The lecture effectively bridges theoretical problem definition with practical application. It starts by establishing the constraints of the Job Scheduling Problem, emphasizing the trade-off between deadlines and profits. The instructor then applies a greedy strategy to a concrete example, visually demonstrating how to map tasks to time slots. By sorting tasks by profit and placing them in the latest possible slot before their deadline, he derives the optimal subset of jobs. The final board state clearly shows which tasks are feasible and which are excluded, reinforcing the algorithmic approach to solving scheduling problems.

Loading lesson…