Consider four processes: A, B, C, D are supposed to be scheduled on a system.…
Consider four processes: A, B, C, D are supposed to be scheduled on a system. All process are arrived at time zero and burst time equals to 6, 3, 5 and 1 nanoseconds respectively. Let P be the process which finishes second last when round robin scheduling is used with time quantum 2ns and Q be the process which finishes third last when round robin scheduling is used with time quantum 4ns. Then P and Q are ?
- A.
B, C
- B.
C, D
- C.
A, D
- D.
C, А
Attempted by 72 students.
Sign up free to check your answer
Sign up freeLoading lesson…

