A 5-stage pipeline has the stage delays as 120, 100, 240, 180 and 140 ns…
A 5-stage pipeline has the stage delays as 120, 100, 240, 180 and 140 ns respectively. Registers that are used between the stages have a delay of 4ns each. Assuming constant clocking rate, the total time taken to process 200 instructions is _______________
- A.
40,000ns
- B.
49,776ns
- C.
30,000ns
- D.
60,000ns
Attempted by 103 students.
Sign up free to check your answer
Sign up freeLoading lesson…

