Stop and Wait Protocol
Duration: 3 min
This video lesson is available to enrolled students.
Inside: a video lesson and guided study material.
Module outline
- About Course: About the Course
- Paper 1 | Quantitative Aptitude: Percentage Ratio and Proportion (Ratios) Powers and Exponents (Surds and Indices) Logarithm Sequence and Series (Series) Mensuration and Geometry Data Interpretation Average Arithmetic Simplification and Approximation Algebra Sequences and Series Profit, Loss and Discount Percentages Number System Ratio and Proportion Averages, Mixtures and Alligation Permutations and Combinations Time and Work Vocabulary Subject-Verb Agreement Sentence Completion Geometry Reading Comprehension Powers, Surds and Logarithms Trigonometry Mensuration Speed, Time and Distance Patterns in Two-Dimensional Figures Probability Measurement and Quantity Take-Off Transformation of Shapes Three-Dimensional Patterns and Visualization Statistics Mathematical Operations Data Sufficiency Constraint Puzzles Data Interpretation Mixture and Alligation Speed Time and Distance HCF LCM Algebra Profit and Loss Venn Diagram
- Paper 1 | Logical Reasoning: Non Verbal Reasoning (Spatial Aptitude) (Spatial Reasoning) (Visual Reasoning) Series (Number and Letter Series) (Numerical Relations and Reasoning) Deductive and Inductive Reasoning (Logical Deduction and Induction) (Prepositional Reasoning) Analogy Cubes & Dices Syllogisms Numerical Reasoning Assembling and Grouping of Shapes Coding and Decoding Cubes and Dice Series Completion Alphabet and Word Tests Analogy and Classification Direction Sense Logical Deduction and Induction Order, Ranking and Sequence Critical Reasoning Syllogisms and Venn Diagrams Narrative Sequencing Project Monitoring, Resources and Safety Simple Interest and Compound Interest Coding Decoding Seating Arrangements
- Paper 1 | English Language: Vocabulary Noun Pronoun Verb Adjectives Adverb Preposition Conjunction Articles Tenses Subject Verb Agreement (Verb Noun Agreement) Modals Sentence Correction (Error Correction) Comprehension / Reading Comprehension / Unseen Passages (Critical Reasoning) (Paragraph Questions) Sentence Re-arrangements (Para Jumbles) (Narrative Sequencing) Prepositions and Conjunctions Idioms and Phrases Verb Forms and Verb Patterns Sentence Basics, Nouns and Pronouns Adjectives and Adverbs Articles and Determiners Modals, Conditionals and Subjunctive Sentence Structure and Correction Voice and Reported Speech Tenses Vocabulary
- Paper 1 | Unit Tests:
- Paper 1 | Full-Length Mock Tests:
- Paper 2 | Engineering Mathematics: Set Theory Relations Functions Graph Theory Group Theory Propositional and Predicate Logic Linear Algebra Calculus Permutation and Combination Probability Statistics Signal Space and Optimum Detection Probability Statistics Combinatorics
- Paper 2 | Digital Logic: Digital Systems & Boolean Basics Logic Gates & Hardware Boolean Expression Boolean Minimization Combinational Circuit Sequential Circuits Number System Number Representation Registers and Counters Boolean Algebra and Logic Gates Microprocessors and Microcontrollers Logic Families and CMOS Logic Microprocessors Logic Gates and Boolean Algebra Number Systems and Codes Minimization of Boolean Functions Timing, Hazards and Testing Logic Families Combinational Logic Design Arithmetic Circuits Semiconductor Memories and Programmable Logic Devices Combinational Logic Circuits Sequential Circuits and State Machines Latches and Flip-Flops Finite State Machines Minimization of Boolean Functions Arithmetic Circuits Registers and Counters Latches and Flip-Flops Number Systems and Codes
- Paper 2 | Computer Architecture: Basics of COA Floating Point Rep Cache Memory Organization Input Output Organisation Pipelining Instr Formats & Modes Control Unit Design Semiconductor Memories and Programmable Logic Processor Organization and Instructions Memory Hierarchy and Input/Output
- Paper 2 | Programming and Data Structures: C Fundamentals Control Flow Functions Arrays & Pointers Storage Classes, Structures & Enums DMA, Macros, Scoping & File Handling Introduction to DS Array Stack Queue Linked List Tree Graphs Hashing
- Paper 2 | Algorithms: Algorithm Analysis Time Complexity Analysis Sorting Algorithms Greedy Algorithms Dynamic Programming Minimum Spanning Trees Shortest Path Algos
- Paper 2 | Theory Of Computation/Automata Theory: Introduction to TOC Deterministic FA (DFA) Non-Deterministic FA Regular Expressions Grammar Regular Language Properties Moore & Mealy Machines Pushdown Automata & CFG Turing Machines Complexity Theory
- Paper 2 | Compiler Design: Intro to Compilers Lexical Analysis Grammar & CFG Syntax Analysis: Top-Down Syntax Analysis: Bottom-Up Semantic Analysis & SDT Intermediate Code Gen Code Optimization Run Time Environment
- Paper 2 | Operating System: Introduction to OS Process Management CPU Scheduling Process Synchronization Threads & Process Creation Deadlock Memory Management Virtual Memory Disc Scheduling File Management
- Paper 2 | DataBase Management System/DBMS: Basics of DBMS ER Diagram Relational Model & Functional Dependencies Keys & Integrity Constraints Normalization (1NF - BCNF) Decomposition Properties & 4NF File Organization & Indexing Relational Algebra SQL Relational Calculus Transaction Management Concurrency Control Database Recovery
- Paper 2 | Computer Networks: Introduction to CN DLL: Access Control DLL: Flow Control DLL: Error Control DLL: Framing Data Link Layer - Ethernet Net Layer: IPv4 & Proto Net Layer: IP Addressing Net Layer:Routing Protocol Transport Layer Services TL: Congestion & UDP Application Layer Hardware Basics
- Paper 2 | CS/IT Sectional Mock Tests:
- Complete Paper Full Mock Test:
AI summary & chapters
AI Summary
An AI-generated summary of this video lecture.
This lecture introduces the Stop-and-Wait Protocol as a fundamental flow control mechanism in data communication. The instructor begins by establishing the problem of receiver overload, explaining that if frames arrive faster than they can be processed, storage becomes an issue. The core definition is presented: the sender transmits a single frame and then stops, waiting for an acknowledgment (ACK) from the receiver before proceeding. A timing diagram visually demonstrates this sequential exchange between Sender A and Receiver B, showing blue Frame blocks followed by orange ACK blocks. The instructor highlights the unidirectional nature of data transmission versus the auxiliary role of ACK tokens, emphasizing that this protocol effectively prevents buffer overflow by forcing the sender to slow down until confirmation is received.
Chapters
0:00 – 2:00 00:00-02:00
The lecture opens with the title "Stop-and-Wait Protocol" displayed on a whiteboard alongside numbered text points. The instructor explains the necessity of flow control, noting that if data frames arrive at the receiver site faster than they can be processed, storage is required. Visible text states that normally receivers do not have enough space to store these frames. To prevent the receiver from becoming overwhelmed, a mechanism is needed to tell the sender to slow down. The instructor defines the protocol explicitly: "The sender sends one frame, stops until it receives confirmation from the receiver... and then sends the next frame." A diagram begins to appear illustrating the sequence of Frames and ACKs traveling between Sender A and Receiver B over time, with the instructor gesturing towards the text to highlight specific steps.
2:00 – 3:22 02:00-03:22
The instructor elaborates on the timing diagram, which depicts Sender A and Receiver B exchanging blue "Frame" blocks and orange "ACK" blocks. Handwritten annotations like "RTT" appear on the timeline at the bottom of the diagram to indicate Round Trip Time. The visual aid emphasizes that while data frames are unidirectional, auxiliary ACK frames act as simple tokens of acknowledgment. The instructor gestures towards the sequence diagram to reinforce that the sender must wait for confirmation before transmitting subsequent data. This section solidifies the concept that flow control is achieved by stopping transmission after each frame until an acknowledgment confirms successful receipt, ensuring the receiver is not overwhelmed.
The Stop-and-Wait Protocol serves as a basic flow control method where the sender transmits one frame and waits for an acknowledgment before sending the next. This approach addresses the issue of receiver buffer overflow by ensuring that frames are not sent faster than they can be processed. The timing diagram clearly shows the alternating sequence of Frames and ACKs, with annotations like RTT indicating the time taken for a round trip. The protocol relies on unidirectional data flow supplemented by auxiliary ACK tokens, creating a simple yet effective mechanism for managing communication speed between Sender A and Receiver B.

