Anuj, Bibhuti and Chandu can lay 432 m of wires together in 8 days. In a day,…

20232025202320252025

Anuj, Bibhuti and Chandu can lay 432 m of wires together in 8 days. In a day, Chandu can lay as many more meters of wire than Bibhuti as Bibhuti can lay more than Anuj. Chandu’s 5 days of work is equivalent to Anuj’s 7 days of work. How many meters of wire can Anuj alone lay in a day?

  1. A.

    9 m

  2. B.

    15 m

  3. C.

    18 m

  4. D.

    21 m

Attempted by 12 students.

Show answer & explanation

Correct answer: B

Key idea: the three rates form an arithmetic progression with Bibhuti as the middle term.

Step 1: Find combined daily work.

They lay 432 m in 8 days, so together per day = 432 ÷ 8 = 54 m. Therefore the average per person = 54 ÷ 3 = 18 m.

Step 2: Use arithmetic progression and given condition.

  • Let Bibhuti = 18 m/day (middle term). Then let Anuj = 18 - x and Chandu = 18 + x.

  • Given: 5 days of Chandu’s work = 7 days of Anuj’s work, so 5(18 + x) = 7(18 - x).

Step 3: Solve the equation.

5(18 + x) = 7(18 - x) ⇒ 90 + 5x = 126 - 7x ⇒ 12x = 36 ⇒ x = 3.

Therefore Anuj = 18 - x = 18 - 3 = 15 m/day.

Explore the full course: Infosys Preparation