4 men can do a work in 7 days. How many men are required to do it in 4 days?

2024

4 men can do a work in 7 days. How many men are required to do it in 4 days?

  1. A.

    7

  2. B.

    8

  3. C.

    9

  4. D.

    10

Attempted by 166 students.

Show answer & explanation

Correct answer: A

Solution:

Key idea: Work (in man-days) = number of men × number of days.

  1. Compute total work: 4 men × 7 days = 28 man-days.

  2. Find required number of men to finish in 4 days: required men = total work ÷ days = 28 ÷ 4 = 7.

  3. Answer: 7 men are required.

Check: 7 men × 4 days = 28 man-days, which equals the original total work, so the result is correct.