Consider the following processes, all arriving at time 0, with their…
PYQ IBPS SO CRP SPL-XIII (2023)
Consider the following processes, all arriving at time 0, with their respective burst times:
Process | Burst Time (ms) |
|---|---|
P1 | 6 |
P2 | 8 |
P3 | 7 |
P4 | 3 |
Using Non-Preemptive Shortest Job First (SJF) scheduling, calculate the average waiting time.
- A.
7.0 ms
- B.
5.5 ms
- C.
6.25 ms
- D.
5.0 ms
- E.
6.0 ms
Attempted by 47 students.
Sign up free to check your answer
Sign up freeLoading lesson…

