Stop and Wait Protocol
Duration: 3 min
This video lesson is available to enrolled students.
Inside: a video lesson and guided study material.
Module outline
- About Course: About the Course
- English Language: Vocabulary, Noun, Adjectives, Tenses, Pronoun, Adverb, Preposition, Conjunction, Active Passive Voice (Voice), Articles, Direct and Indirect Speech, Sentence Correction (Error Correction), Sentence Re-arrangements (Para Jumbles) (Narrative Sequencing), Comprehension / Reading Comprehension / Unseen Passages (Critical Reasoning) (Paragraph Questions), Sentence Completion (Fill in the blanks), Cloze Test (Cloze Passage)
- Quantitative Aptitude & Numerical Ability: Ratio and Proportion (Ratios), Data Interpretation, Mixture and Alligation, Permutation and Combination, Number System, Sequence and Series (Series), Speed Time and Distance, Algebra, Speed Mathematics and Basic Mathematics, Percentage, Average, Time and Work, Simple Interest and Compound Interest, Profit and Loss, Age Problems, Partnership, Mensuration and Geometry, Probability, IBPS Specific Videos
- Reasoning: Series (Number and Letter Series) (Numerical Relations and Reasoning), Coding Decoding, Data Sufficiency, Puzzle Solving (Puzzles), Seating Arrangements, Blood Relations, Syllogisms, Inequality, Directions (Direction Test), Deductive and Inductive Reasoning (Logical Deduction and Induction) (Prepositional Reasoning), Clock, Calendar, Analytical Reasoning (Counting Figures Reasoning), Selection Decision Table (Decision Making), Cubes & Dices, Machine Input-Output
- Data Structures- Professional Knowledge: Introduction to DS, Array, Stack, Queue, Linked List, Tree, Graphs, Hashing
- Algorithms- Professional Knowledge: Algorithm Analysis, Time Complexity Analysis, Sorting Algorithms, Greedy Algorithms, Dynamic Programming, Minimum Spanning Trees, Shortest Path Algos
- Python- Professional Knowledge: Python for Placements by Yash Sir, Collections & Strings, Functions & Modules, File Handling & Data Analysis, Python Basics
- Operating System- Professional Knowledge: Introduction to OS, Process Management, Process Synchronization, CPU Scheduling, Deadlock, Threads & Process Creation, Memory Management, Virtual Memory, Disc Scheduling, File Management, Unix OS, Linux OS, Windows OS
- DBMS + SQL- Professional Knowledge: Basics of DBMS, ER Diagram, Relational Model & Functional Dependencies, Keys & Integrity Constraints, Normalization (1NF - BCNF), File Organization & Indexing, SQL, Transaction Management, Concurrency Control, Relational Algebra, Relational Calculus, NoSQL, Data Warehousing & Mining
- Computer Networks- Professional Knowledge: Introduction to CN, Data Communication, Net Layer: IP Addressing, Net Layer: IPv4 & Proto, Application Layer, Hardware basics, Network Security, Transport Layer Services, DLL: Flow Control, Cloud Computing
- Software Engineering- Professional Knowledge: Fundamentals of Software Engineering, Software Requirements and Quality Assurance, Software Design, Estimation and Metrics, Software Testing, Software Maintenance and Configuration Management
- Computer Organization & Microprocessor- Professional Knowledge: Basics of COA, Cache Memory Organization, Programming the Basic Computer, Instr Formats & Modes
- Digital Logic Design- Professional Knowledge: Digital Systems & Boolean Basics, Logic Gates & Hardware, Boolean Expression, Boolean Minimization, Combinational Circuit, Sequential Circuits, Number System, Number Representation
- Theory of Computation- Professional Knowledge: Introduction to TOC, Deterministic FA (DFA), Non-Deterministic FA, Regular Expressions, Regular Language Properties, Pushdown Automata & CFG, Turing Machines
- Compiler Design- Professional Knowledge: Intro to Compilers, Lexical Analysis, Grammar & CFG, Syntax Analysis: Top-Down, Intermediate Code Gen, Code Optimization
- Programming Languages- Professional Knowledge: C Programming by Yash Sir, Language Design, DMA, Macros, Scoping & File Handling, Object Oriented Programming (OOPS), Programming in C++, Java, HTML, C Language Core
- Emerging Tech- Professional Knowledge: Emerging Tech Trends, MS Office Applications
- Artificial Intelligence: Artificial Intelligence
- Image Processing: Digital Image Fundamentals
- Internet & Web Technology: Website, Browser & Services, Internet Fundamentals, Server Side & Security, Cyber Threats and Malware Attacks, Role of Internet and Web Services, Security in Mobile and Wireless Computing, Electronic Data Interchange and E-Commerce, Physical Security and Cryptography Basics, Cyber Safety and Security, Ethical Hacking
- Descriptive Paper: English Writing Ability
- Mains - Unit Tests:
- Mains - Full Mock Tests:
AI summary & chapters
AI Summary
An AI-generated summary of this video lecture.
This lecture introduces the Stop-and-Wait Protocol as a fundamental flow control mechanism in data communication. The instructor begins by establishing the problem of receiver overload, explaining that if frames arrive faster than they can be processed, storage becomes an issue. The core definition is presented: the sender transmits a single frame and then stops, waiting for an acknowledgment (ACK) from the receiver before proceeding. A timing diagram visually demonstrates this sequential exchange between Sender A and Receiver B, showing blue Frame blocks followed by orange ACK blocks. The instructor highlights the unidirectional nature of data transmission versus the auxiliary role of ACK tokens, emphasizing that this protocol effectively prevents buffer overflow by forcing the sender to slow down until confirmation is received.
Chapters
0:00 – 2:00 00:00-02:00
The lecture opens with the title "Stop-and-Wait Protocol" displayed on a whiteboard alongside numbered text points. The instructor explains the necessity of flow control, noting that if data frames arrive at the receiver site faster than they can be processed, storage is required. Visible text states that normally receivers do not have enough space to store these frames. To prevent the receiver from becoming overwhelmed, a mechanism is needed to tell the sender to slow down. The instructor defines the protocol explicitly: "The sender sends one frame, stops until it receives confirmation from the receiver... and then sends the next frame." A diagram begins to appear illustrating the sequence of Frames and ACKs traveling between Sender A and Receiver B over time, with the instructor gesturing towards the text to highlight specific steps.
2:00 – 3:22 02:00-03:22
The instructor elaborates on the timing diagram, which depicts Sender A and Receiver B exchanging blue "Frame" blocks and orange "ACK" blocks. Handwritten annotations like "RTT" appear on the timeline at the bottom of the diagram to indicate Round Trip Time. The visual aid emphasizes that while data frames are unidirectional, auxiliary ACK frames act as simple tokens of acknowledgment. The instructor gestures towards the sequence diagram to reinforce that the sender must wait for confirmation before transmitting subsequent data. This section solidifies the concept that flow control is achieved by stopping transmission after each frame until an acknowledgment confirms successful receipt, ensuring the receiver is not overwhelmed.
The Stop-and-Wait Protocol serves as a basic flow control method where the sender transmits one frame and waits for an acknowledgment before sending the next. This approach addresses the issue of receiver buffer overflow by ensuring that frames are not sent faster than they can be processed. The timing diagram clearly shows the alternating sequence of Frames and ACKs, with annotations like RTT indicating the time taken for a round trip. The protocol relies on unidirectional data flow supplemented by auxiliary ACK tokens, creating a simple yet effective mechanism for managing communication speed between Sender A and Receiver B.

