A, B, and C together can complete a piece of work in 10 days, and B and C…

PYQ IBPS Clerk CRP CSA-XV (2025)

A, B, and C together can complete a piece of work in 10 days, and B and C together can do the same work in 25 days. Find the time taken by A alone to complete the work (in days).

  1. A.

    6.67

  2. B.

    8.33

  3. C.

    12.5

  4. D.

    13.33

  5. E.

    16.67

Attempted by 3 students.

Sign up free to check your answer

Sign up free

Explore the full course: Ibps Clerk Csa Prelims

Loading lesson…