Efficiency of Ritu is 60% more than Rakesh and difference between the number…

PYQ IBPS 2022 (paper not recorded)

Efficiency of Ritu is 60% more than Rakesh and difference between the number of days taken by them to complete a work in 18 days. If efficiency of Rahul is 12.5% less than Ritu, then find the time taken by all the three to together to complete the work.

  1. A.

    10 days

  2. B.

    12 days

  3. C.

    9.5 days

  4. D.

    7 days

  5. E.

    5.5 days

Attempted by 41 students.