Consider a 5-stage pipeline whose stage delays (in ms) are: IF = 5, ID = 3, EX…

Consider a 5-stage pipeline whose stage delays (in ms) are: IF = 5, ID = 3, EX = 5, MEM = 7, WB = 6. The pipeline runs without branch prediction and every instruction passes through all five stages. The program contains 28 instructions I1​ to I28. Instruction I6​ is an unconditional transfer of control to I19 . The branch resolves (target becomes available) during the branch instruction’s execution stage.

Determine the program execution time _________ (ms).

Attempted by 235 students.

Sign up free to check your answer

Sign up free

Explore the full course: Gate Guidance By Sanchit Sir

Loading lesson…