A contractor employed 60 men to do a certain work in 50 days. After 20 days,…
PYQ DSSSB 2021
A contractor employed 60 men to do a certain work in 50 days. After 20 days, 20 men left the work, so he employed 20 women at that time. If each woman works at 3/5 of the rate of each man, then how many extra days are needed to complete the work than the scheduled time?
- A.
6 8/13
- B.
4 8/13
- C.
3 5/13
- D.
5 9/13