A contractor employed 60 men to do a certain work in 50 days. After 20 days,…

PYQ DSSSB 2021

A contractor employed 60 men to do a certain work in 50 days. After 20 days, 20 men left the work, so he employed 20 women at that time. If each woman works at 3/5 of the rate of each man, then how many extra days are needed to complete the work than the scheduled time?

  1. A.

    6 8/13

  2. B.

    4 8/13

  3. C.

    3 5/13

  4. D.

    5 9/13