The length of a road is 10 km. The number of plants required for plantation at…

PYQ DSSSB 2021

The length of a road is 10 km. The number of plants required for plantation at a gap of 12.5 m on both sides of the road is:

  1. A.

    800

  2. B.

    801

  3. C.

    1600

  4. D.

    1602

Attempted by 34 students.

Sign up free to check your answer

Sign up free

Explore the full course: Dsssb Section A

Loading lesson…