Detailed cocomo

Duration: 2 min

This video lesson is available to enrolled students.

Return to /learn/DELOITTE-NLA/technical-skills-mcq-software-engineering/software-design-estimation-and-metrics/software-project-estimation/asset-detailed-cocomo after enrolling

Inside: a video lesson and guided study material.

Module outline

  1. Language Skills (English): Vocabulary Verbal Analogy (Word Based Analogy) Noun Pronoun Verb Adjectives Adverb Preposition Articles Conjunction Tenses Modals Subject Verb Agreement (Verb Noun Agreement) Determiner Active Passive Voice (Voice) Direct and Indirect Speech Sentence Correction (Error Correction) Sentence Completion (Fill in the blanks) Sentence Construction Sentence Re-arrangements (Para Jumbles) (Narrative Sequencing) Comprehension / Reading Comprehension / Unseen Passages (Critical Reasoning) (Paragraph Questions) Cloze Test (Cloze Passage)
  2. General Aptitude (Quantitative Ability): Percentage Ratio and Proportion (Ratios) Average Profit and Loss Simple Interest and Compound Interest Time and Work Pipe and Cistern Speed Time and Distance Mixture and Alligation Age Problems Partnership Number System HCF LCM Divisibility Rules Powers and Exponents (Surds and Indices) Algebra Data Interpretation Statistics Sequence and Series (Series) Logarithm Arithmetic
  3. General Aptitude (Reasoning Ability): Series (Number and Letter Series) (Numerical Relations and Reasoning) Coding Decoding Syllogisms Blood Relations Directions (Direction Test) Ranking, Order and Sequence Inequality Logical Sequence Of Words Seating Arrangements Puzzle Solving (Puzzles) Non Verbal Reasoning (Spatial Aptitude) (Spatial Reasoning) (Visual Reasoning) Cubes & Dices Venn Diagram Deductive and Inductive Reasoning (Logical Deduction and Induction) (Prepositional Reasoning) Selection Decision Table (Decision Making) Analytical Reasoning (Counting Figures Reasoning) Clock Calendar Data Sufficiency Analogy
  4. Technical Skills MCQ - Data Structure: Introduction to DS Array Stack Queue Linked List Tree Graphs Hashing
  5. Technical Skills MCQ - Networking: Introduction to CN Data Communication DLL: Access Control DLL: Flow Control DLL: Error Control DLL: Framing Data Link Layer - Ethernet Net Layer: IPv4 & Proto Net Layer: IP Addressing Net Layer:Routing Protocol Transport Layer Services Application Layer Network Security
  6. Technical Skills MCQ - Operating System: Introduction to OS Process Management CPU Scheduling Process Synchronization Deadlock Threads & Process Creation Memory Management Virtual Memory File Management Windows OS Linux OS Security Virtual Machines
  7. Technical Skills MCQ - DBMS: Basics of DBMS ER Diagram Relational Model & Functional Dependencies Keys & Integrity Constraints Normalization (1NF - BCNF) File Organization & Indexing Relational Algebra SQL Transaction Management Concurrency Control Database Recovery Database Security & Authorization NoSQL
  8. Technical Skills MCQ - Software Engineering: Fundamentals of Software Engineering Software Requirements and Quality Assurance Software Design, Estimation and Metrics Software Testing Software Maintenance and Configuration Management
  9. Technical Skills MCQ - Cloud Computing: Cloud Computing and IoT
  10. Technical Skills MCQ - Cyber Security: Cyber and Info Security Security in Mobile and Wireless Computing
  11. Technical Skills (Coding): Coding Questions by Yash Sir C Programming by Yash Sir Programming in C++ Java Python for Placements by Yash Sir Object Oriented Programming (OOPS) DSA by Prashant sir Coding Questions Bank
AI summary & chapters

AI Summary

An AI-generated summary of this video lecture.

The video is an educational lecture on software project estimation models, presented by an instructor from Knowledge Gate. It begins with an introduction to the Detailed COCOMO model, which is described as the most comprehensive and accurate model for estimating software projects. The model's definition is provided, highlighting that it divides a project into multiple components or modules and accounts for interactions between cost drivers and project phases. The lecture explains that the model estimates effort and duration for each component using the Intermediate COCOMO model and then sums these up. It also notes that the Detailed COCOMO model considers factors such as software reuse, hardware constraints, and personnel/team attributes. The presentation then transitions to a slide titled 'Other Empirical models,' which lists several formulas for estimating effort (E) based on the number of lines of code (KLOC). These include the Watson & Felix Model (E = 5.2 x KLOC^0.91), the Bailey-Basili Model (E = 5.2 + 0.73 x KLOC^1.16), the Simple Boehm Model (E = 3.2 x KLOC^1.05), and the Doty Model (E = 5.288 x KLOC^1.047). The video concludes with a 'Thanks for watching' screen.

Chapters

  1. 0:00 – 2:00 00:00-02:00

    The video starts with a title card for 'SOFTWARE ENGINEERING' and '#knowledgegate'. It then transitions to a lecture slide titled 'Detailed COCOMO'. The instructor, Sanchit Jain, explains the definition of the Detailed COCOMO model, which is described as the most comprehensive and accurate model that divides a software project into multiple components or modules and accounts for interactions between cost drivers and project phases. The slide lists that the model estimates effort and duration for each component using the Intermediate COCOMO model and then sums them up, and it considers software reuse, hardware constraints, and personnel/team attributes. The presentation then moves to a slide titled 'Other Empirical models', which displays several formulas for effort estimation: E = 5.2 x KLOC^0.91 (Watson & Felix Model), E = 5.2 + 0.73 x KLOC^1.16 (Bailey-Basili Model), E = 3.2 x KLOC^1.05 (Simple Boehm Model), and E = 5.288 x KLOC^1.047 (Doty Model). The video ends with a 'Thanks for watching' screen.

The lecture provides a structured overview of software estimation techniques, starting with the most detailed model, Detailed COCOMO, which emphasizes a component-based approach and considers multiple project factors. It then contrasts this with a set of simpler, empirical models that use a direct mathematical relationship between effort and lines of code. This progression highlights the difference between a comprehensive, multi-factor model and more straightforward, formulaic approaches, giving students a comparative understanding of estimation methodologies.

Loading lesson…