Round Robin PQ
Duration: 13 min
This video lesson is available to enrolled students.
Inside: a video lesson and guided study material.
Module outline
- Language Skills (English): Vocabulary Verbal Analogy (Word Based Analogy) Noun Pronoun Verb Adjectives Adverb Preposition Articles Conjunction Tenses Modals Subject Verb Agreement (Verb Noun Agreement) Determiner Active Passive Voice (Voice) Direct and Indirect Speech Sentence Correction (Error Correction) Sentence Completion (Fill in the blanks) Sentence Construction Sentence Re-arrangements (Para Jumbles) (Narrative Sequencing) Comprehension / Reading Comprehension / Unseen Passages (Critical Reasoning) (Paragraph Questions) Cloze Test (Cloze Passage)
- General Aptitude (Quantitative Ability): Percentage Ratio and Proportion (Ratios) Average Profit and Loss Simple Interest and Compound Interest Time and Work Pipe and Cistern Speed Time and Distance Mixture and Alligation Age Problems Partnership Number System HCF LCM Divisibility Rules Powers and Exponents (Surds and Indices) Algebra Data Interpretation Statistics Sequence and Series (Series) Logarithm Arithmetic
- General Aptitude (Reasoning Ability): Series (Number and Letter Series) (Numerical Relations and Reasoning) Coding Decoding Syllogisms Blood Relations Directions (Direction Test) Ranking, Order and Sequence Inequality Logical Sequence Of Words Seating Arrangements Puzzle Solving (Puzzles) Non Verbal Reasoning (Spatial Aptitude) (Spatial Reasoning) (Visual Reasoning) Cubes & Dices Venn Diagram Deductive and Inductive Reasoning (Logical Deduction and Induction) (Prepositional Reasoning) Selection Decision Table (Decision Making) Analytical Reasoning (Counting Figures Reasoning) Clock Calendar Data Sufficiency Analogy
- Technical Skills MCQ - Data Structure: Introduction to DS Array Stack Queue Linked List Tree Graphs Hashing
- Technical Skills MCQ - Networking: Introduction to CN Data Communication DLL: Access Control DLL: Flow Control DLL: Error Control DLL: Framing Data Link Layer - Ethernet Net Layer: IPv4 & Proto Net Layer: IP Addressing Net Layer:Routing Protocol Transport Layer Services Application Layer Network Security
- Technical Skills MCQ - Operating System: Introduction to OS Process Management CPU Scheduling Process Synchronization Deadlock Threads & Process Creation Memory Management Virtual Memory File Management Windows OS Linux OS Security Virtual Machines
- Technical Skills MCQ - DBMS: Basics of DBMS ER Diagram Relational Model & Functional Dependencies Keys & Integrity Constraints Normalization (1NF - BCNF) File Organization & Indexing Relational Algebra SQL Transaction Management Concurrency Control Database Recovery Database Security & Authorization NoSQL
- Technical Skills MCQ - Software Engineering: Fundamentals of Software Engineering Software Requirements and Quality Assurance Software Design, Estimation and Metrics Software Testing Software Maintenance and Configuration Management
- Technical Skills MCQ - Cloud Computing: Cloud Computing and IoT
- Technical Skills MCQ - Cyber Security: Cyber and Info Security Security in Mobile and Wireless Computing
- Technical Skills (Coding): Coding Questions by Yash Sir C Programming by Yash Sir Programming in C++ Java Python for Placements by Yash Sir Object Oriented Programming (OOPS) DSA by Prashant sir Coding Questions Bank
AI summary & chapters
AI Summary
An AI-generated summary of this video lecture.
The video demonstrates a Round Robin scheduling practice problem. The instructor sets up a table for six processes (P0-P5) with arrival and burst times, then constructs a Gantt chart using a time quantum of 3 units. A queue box tracks the ready processes as they are scheduled. The instructor calculates completion times, turnaround times, and waiting times for each process, ultimately deriving the average turnaround time and average waiting time. The solution involves tracking process execution across multiple time slices and managing the ready queue as new processes arrive and others complete.
Chapters
0:00 – 2:00 00:00-02:00
The instructor introduces the problem: calculating average TAT and WT using Round Robin with a time quantum of 3 units. A table is set up with columns for P. No, Arrival Time (AT), Burst Time (BT), Completion Time (CT), TAT = CT - AT, and WT = TAT - BT. The arrival times are filled in as 5, 4, 3, 1, 2, 6 for P0 through P5, and burst times are listed as 5, 6, 7, 9, 2, 3. The instructor begins sketching a Gantt chart, starting with an idle region from 0 to 1, then scheduling P3 first since it has the earliest arrival time.
2:00 – 5:00 02:00-05:00
The Gantt chart expands to show P3 executing from 1 to 4, followed by P4 from 4 to 6, P0 from 6 to 9, and P1 from 9 to 12. A pink Queue box on the right tracks the ready processes, initially showing P4, P0, P3, P5, then adding P2 and another P4 as processes arrive and wait. The instructor explains how processes are added to the queue upon arrival and how the quantum of 3 units determines when a process is preempted and sent to the back of the queue.
5:00 – 10:00 05:00-10:00
The Gantt chart continues with P3 resuming from 12 to 15, then P0 from 15 to 18, P5 from 18 to 21, and P0 again from 21 to 24. The queue box updates to reflect the changing ready state, showing sequences like P1, P5, P3, P2, P4 shifting to longer sequences including P0 and P1. The instructor fills in the Burst Time column with values 8, 3, 4, 3, 2, 3 in pink and green ink, while the AT column remains 5, 4, 3, 1, 2, 6. The process of tracking remaining burst times and re-queuing preempted processes is emphasized.
10:00 – 13:20 10:00-13:20
The instructor completes the table by filling in the CT column with values 32, 27, 30, 30, 06, 01, then calculates TAT as 27, 23, 27, 29, 04, 15, and WT as 22, 17, 23, 20, 02, 12. The final Gantt chart shows the complete execution sequence with time markers up to 33. The instructor computes the averages, showing 76/6 = 12.8 for average TAT and 96/6 for average WT. The queue box displays the final sequence P1 P0 P1 P3 P0 P5 P0 P1 P3 P0 P5, illustrating the full scheduling order.
This lecture provides a step-by-step worked example of Round Robin scheduling. The key concepts include: (1) setting up a process table with arrival and burst times, (2) constructing a Gantt chart that respects the time quantum, (3) maintaining a ready queue that updates as processes arrive and are preempted, and (4) calculating completion, turnaround, and waiting times. The method emphasizes that when a process's quantum expires, it is sent to the back of the queue with its remaining burst time. New arrivals are added to the queue in order of arrival. The final metrics are derived by summing individual TAT and WT values and dividing by the number of processes. The example demonstrates how to handle multiple preemptions and arrivals within a single scheduling problem.

