Stop and Wait Protocol

Duration: 3 min

This video lesson is available to enrolled students.

Return to /learn/DELOITTE-NLA/technical-skills-mcq-networking/dll-flow-control/basics-delay-analysis/asset-stop-and-wait-protocol after enrolling

Inside: a video lesson and guided study material.

Module outline

  1. Language Skills (English): Vocabulary Verbal Analogy (Word Based Analogy) Noun Pronoun Verb Adjectives Adverb Preposition Articles Conjunction Tenses Modals Subject Verb Agreement (Verb Noun Agreement) Determiner Active Passive Voice (Voice) Direct and Indirect Speech Sentence Correction (Error Correction) Sentence Completion (Fill in the blanks) Sentence Construction Sentence Re-arrangements (Para Jumbles) (Narrative Sequencing) Comprehension / Reading Comprehension / Unseen Passages (Critical Reasoning) (Paragraph Questions) Cloze Test (Cloze Passage)
  2. General Aptitude (Quantitative Ability): Percentage Ratio and Proportion (Ratios) Average Profit and Loss Simple Interest and Compound Interest Time and Work Pipe and Cistern Speed Time and Distance Mixture and Alligation Age Problems Partnership Number System HCF LCM Divisibility Rules Powers and Exponents (Surds and Indices) Algebra Data Interpretation Statistics Sequence and Series (Series) Logarithm Arithmetic
  3. General Aptitude (Reasoning Ability): Series (Number and Letter Series) (Numerical Relations and Reasoning) Coding Decoding Syllogisms Blood Relations Directions (Direction Test) Ranking, Order and Sequence Inequality Logical Sequence Of Words Seating Arrangements Puzzle Solving (Puzzles) Non Verbal Reasoning (Spatial Aptitude) (Spatial Reasoning) (Visual Reasoning) Cubes & Dices Venn Diagram Deductive and Inductive Reasoning (Logical Deduction and Induction) (Prepositional Reasoning) Selection Decision Table (Decision Making) Analytical Reasoning (Counting Figures Reasoning) Clock Calendar Data Sufficiency Analogy
  4. Technical Skills MCQ - Data Structure: Introduction to DS Array Stack Queue Linked List Tree Graphs Hashing
  5. Technical Skills MCQ - Networking: Introduction to CN Data Communication DLL: Access Control DLL: Flow Control DLL: Error Control DLL: Framing Data Link Layer - Ethernet Net Layer: IPv4 & Proto Net Layer: IP Addressing Net Layer:Routing Protocol Transport Layer Services Application Layer Network Security
  6. Technical Skills MCQ - Operating System: Introduction to OS Process Management CPU Scheduling Process Synchronization Deadlock Threads & Process Creation Memory Management Virtual Memory File Management Windows OS Linux OS Security Virtual Machines
  7. Technical Skills MCQ - DBMS: Basics of DBMS ER Diagram Relational Model & Functional Dependencies Keys & Integrity Constraints Normalization (1NF - BCNF) File Organization & Indexing Relational Algebra SQL Transaction Management Concurrency Control Database Recovery Database Security & Authorization NoSQL
  8. Technical Skills MCQ - Software Engineering: Fundamentals of Software Engineering Software Requirements and Quality Assurance Software Design, Estimation and Metrics Software Testing Software Maintenance and Configuration Management
  9. Technical Skills MCQ - Cloud Computing: Cloud Computing and IoT
  10. Technical Skills MCQ - Cyber Security: Cyber and Info Security Security in Mobile and Wireless Computing
  11. Technical Skills (Coding): Coding Questions by Yash Sir C Programming by Yash Sir Programming in C++ Java Python for Placements by Yash Sir Object Oriented Programming (OOPS) DSA by Prashant sir Coding Questions Bank
AI summary & chapters

AI Summary

An AI-generated summary of this video lecture.

This lecture introduces the Stop-and-Wait Protocol as a fundamental flow control mechanism in data communication. The instructor begins by establishing the problem of receiver overload, explaining that if frames arrive faster than they can be processed, storage becomes an issue. The core definition is presented: the sender transmits a single frame and then stops, waiting for an acknowledgment (ACK) from the receiver before proceeding. A timing diagram visually demonstrates this sequential exchange between Sender A and Receiver B, showing blue Frame blocks followed by orange ACK blocks. The instructor highlights the unidirectional nature of data transmission versus the auxiliary role of ACK tokens, emphasizing that this protocol effectively prevents buffer overflow by forcing the sender to slow down until confirmation is received.

Chapters

  1. 0:00 – 2:00 00:00-02:00

    The lecture opens with the title "Stop-and-Wait Protocol" displayed on a whiteboard alongside numbered text points. The instructor explains the necessity of flow control, noting that if data frames arrive at the receiver site faster than they can be processed, storage is required. Visible text states that normally receivers do not have enough space to store these frames. To prevent the receiver from becoming overwhelmed, a mechanism is needed to tell the sender to slow down. The instructor defines the protocol explicitly: "The sender sends one frame, stops until it receives confirmation from the receiver... and then sends the next frame." A diagram begins to appear illustrating the sequence of Frames and ACKs traveling between Sender A and Receiver B over time, with the instructor gesturing towards the text to highlight specific steps.

  2. 2:00 – 3:22 02:00-03:22

    The instructor elaborates on the timing diagram, which depicts Sender A and Receiver B exchanging blue "Frame" blocks and orange "ACK" blocks. Handwritten annotations like "RTT" appear on the timeline at the bottom of the diagram to indicate Round Trip Time. The visual aid emphasizes that while data frames are unidirectional, auxiliary ACK frames act as simple tokens of acknowledgment. The instructor gestures towards the sequence diagram to reinforce that the sender must wait for confirmation before transmitting subsequent data. This section solidifies the concept that flow control is achieved by stopping transmission after each frame until an acknowledgment confirms successful receipt, ensuring the receiver is not overwhelmed.

The Stop-and-Wait Protocol serves as a basic flow control method where the sender transmits one frame and waits for an acknowledgment before sending the next. This approach addresses the issue of receiver buffer overflow by ensuring that frames are not sent faster than they can be processed. The timing diagram clearly shows the alternating sequence of Frames and ACKs, with annotations like RTT indicating the time taken for a round trip. The protocol relies on unidirectional data flow supplemented by auxiliary ACK tokens, creating a simple yet effective mechanism for managing communication speed between Sender A and Receiver B.

Loading lesson…