Practice Questions
Duration: 11 min
This video lesson is available to enrolled students.
Inside: a video lesson and guided study material.
Module outline
- Language Skills (English): Vocabulary, Verbal Analogy (Word Based Analogy), Noun, Pronoun, Verb, Adjectives, Adverb, Preposition, Articles, Conjunction, Tenses, Modals, Subject Verb Agreement (Verb Noun Agreement), Determiner, Active Passive Voice (Voice), Direct and Indirect Speech, Sentence Correction (Error Correction), Sentence Completion (Fill in the blanks), Sentence Construction, Sentence Re-arrangements (Para Jumbles) (Narrative Sequencing), Comprehension / Reading Comprehension / Unseen Passages (Critical Reasoning) (Paragraph Questions), Cloze Test (Cloze Passage)
- General Aptitude (Quantitative Ability): Percentage, Ratio and Proportion (Ratios), Average, Profit and Loss, Simple Interest and Compound Interest, Time and Work, Pipe and Cistern, Speed Time and Distance, Mixture and Alligation, Age Problems, Partnership, Number System, HCF LCM, Divisibility Rules, Powers and Exponents (Surds and Indices), Algebra, Data Interpretation, Statistics, Sequence and Series (Series), Logarithm, Arithmetic, Speed Mathematics and Basic Mathematics
- General Aptitude (Reasoning Ability): Series (Number and Letter Series) (Numerical Relations and Reasoning), Coding Decoding, Syllogisms, Blood Relations, Directions (Direction Test), Ranking, Order and Sequence, Inequality, Logical Sequence Of Words, Seating Arrangements, Puzzle Solving (Puzzles), Non Verbal Reasoning (Spatial Aptitude) (Spatial Reasoning) (Visual Reasoning), Cubes & Dices, Venn Diagram, Deductive and Inductive Reasoning (Logical Deduction and Induction) (Prepositional Reasoning), Selection Decision Table (Decision Making), Analytical Reasoning (Counting Figures Reasoning), Clock, Calendar, Data Sufficiency, Analogy
- Technical Skills MCQ - Data Structure: Introduction to DS, Array, Stack, Queue, Linked List, Tree, Graphs, Hashing
- Technical Skills MCQ - Networking: Introduction to CN, Data Communication, DLL: Access Control, DLL: Flow Control, DLL: Error Control, DLL: Framing, Data Link Layer - Ethernet, Net Layer: IPv4 & Proto, Net Layer: IP Addressing, Net Layer:Routing Protocol, Transport Layer Services, Application Layer, Mobile Technology, Network Security
- Technical Skills MCQ - Operating System: Introduction to OS, Process Management, CPU Scheduling, Process Synchronization, Deadlock, Threads & Process Creation, Memory Management, Virtual Memory, File Management, Windows OS, Linux OS, Security, Virtual Machines
- Technical Skills MCQ - DBMS: Basics of DBMS, ER Diagram, Relational Model & Functional Dependencies, Keys & Integrity Constraints, Normalization (1NF - BCNF), File Organization & Indexing, Relational Algebra, SQL, Transaction Management, Concurrency Control, Database Recovery, Database Security & Authorization, NoSQL
- Technical Skills MCQ - Software Engineering: Fundamentals of Software Engineering, Software Requirements and Quality Assurance, Software Design, Estimation and Metrics, Software Testing, Software Maintenance and Configuration Management
- Technical Skills MCQ - Cloud Computing: Emerging Tech Trends, Cloud Computing and IoT
- Technical Skills MCQ - Cyber Security: Cyber and Info Security, Security in Mobile and Wireless Computing
- Technical Skills (Coding): Coding Questions by Yash Sir, C Programming by Yash Sir, Programming in C++, Java, Python for Placements by Yash Sir, Object Oriented Programming (OOPS)
AI summary & chapters
AI Summary
An AI-generated summary of this video lecture.
This educational video presents a series of time and work problems, a common topic in quantitative aptitude. The instructor, Yash Jain Sir, systematically solves three distinct problems. The first problem involves three machines (P, Q, R) with different printing speeds, where machine P stops after 2 hours, and the remaining work is completed by machines Q and R. The solution uses the formula: (Time worked by P / P's alone time) + (Time worked by Q / Q's alone time) + (Time worked by R / R's alone time) = 1. The second problem features a work scenario where one man starts a job, and one more man joins him every day, with the total work being equivalent to 60 men working for 25 days. The solution involves summing the work done each day (1+2+3+...+n) and equating it to the total work. The third problem is an 'alternate days' problem where Anushka and Virat work on alternate days, with Anushka starting first. The solution calculates the work done in a two-day cycle and then determines the total number of days required. The video uses a digital whiteboard to write out the problems, formulas, and step-by-step calculations, with the instructor providing verbal explanations throughout.
Chapters
0:00 – 2:00 00:00-02:00
The video opens with a title card for a 'TIME & WORK' lesson. The first problem (Q1) is presented on a green digital board. It states that machine P can print one lakh books in 8 hours, machine Q in 10 hours, and machine R in 12 hours. All machines start at 9 AM, but machine P stops at 11 AM. The question asks at what time the work will be completed. The instructor, Yash Jain Sir, is visible in a small window, and the Microsoft logo is in the top right corner. The problem is clearly laid out with the options (A) 11:30 AM, (B) 12 noon, (C) 12:30 PM, (D) 1:00 PM.
2:00 – 5:00 02:00-05:00
The instructor begins solving Q1. He writes the formula for work: (Time worked by P / P's alone time) + (Time worked by Q / Q's alone time) + (Time worked by R / R's alone time) = 1. He identifies that machine P works for 2 hours (from 9 AM to 11 AM). He then sets up the equation: (2/8) + (x/10) + (x/12) = 1, where x is the time (in hours) that machines Q and R work together after P stops. He proceeds to solve this equation by finding a common denominator (120) and simplifying to 30 + 12x + 10x = 120, which becomes 22x = 90. He calculates x = 90/22, which is approximately 4.09 hours. The instructor then states that the work will be completed at 12:30 PM, which is 2 hours after 10:30 AM, but the calculation shows 4.09 hours after 11 AM, which would be 3:05 PM. The instructor's final answer is 12:30 PM, which is inconsistent with his calculation. The video shows the instructor writing the equation and the steps to solve it.
5:00 – 10:00 05:00-10:00
The video transitions to the second problem (Q2). The problem states that 60 men can complete a work in 25 days. One man starts the work, and one more man joins him every day. The question asks how many days the work will be completed. The instructor writes the formula for total work: MEN * TIME. He calculates the total work as 60 * 25 = 1500 man-days. He then sets up the equation for the work done: 1*1 + 2*1 + 3*1 + ... + n*1 = 1500, which simplifies to the sum of the first n natural numbers: n(n+1)/2 = 1500. He multiplies both sides by 2 to get n(n+1) = 3000. He then solves the quadratic equation n^2 + n - 3000 = 0. The instructor states that the answer is 54 days, which corresponds to option (D). The video shows the step-by-step derivation of the equation and the final answer.
10:00 – 11:07 10:00-11:07
The video presents the third problem (Q3) on 'Alternate Days Problems'. Anushka can complete a work in 9 days, and Virat can complete it in 12 days. They work on alternate days, with Anushka starting first. The question asks how many days the work will be completed. The instructor writes the work rates: Anushka's rate is 1/9 per day, and Virat's rate is 1/12 per day. He calculates the work done in a two-day cycle: (1/9 + 1/12) = (4/36 + 3/36) = 7/36. He then determines how many such cycles are needed: 36/7 = 5 cycles with a remainder of 1/7. He calculates the work done in 10 days (5 cycles) as 5 * (7/36) = 35/36. The remaining work is 1 - 35/36 = 1/36. On the 11th day, Anushka works and completes 1/9 of the work, which is more than the remaining 1/36. The instructor concludes that the work will be completed in 10 and 1/4 days, which is 10.25 days. The video ends with a 'THANKS FOR WATCHING' screen.
The video provides a comprehensive walkthrough of three different types of time and work problems. It begins with a standard problem involving multiple machines with different work rates, demonstrating the use of the work formula. It then moves to a more complex problem involving a changing workforce, requiring the sum of an arithmetic series. Finally, it tackles an 'alternate days' problem, which requires calculating the work done in a repeating cycle. The progression shows a clear increase in complexity, from a single formula application to a multi-step problem involving series and cycles. The instructor uses a digital whiteboard to clearly present the problems and calculations, making the solution process easy to follow.