Stop and Wait Protocol
Duration: 3 min
This video lesson is available to enrolled students.
Inside: a video lesson and guided study material.
Module outline
- Communication Round: Vocabulary, Subject Verb Agreement (Verb Noun Agreement), Tenses, Comprehension / Reading Comprehension / Unseen Passages (Critical Reasoning) (Paragraph Questions), Cloze Test (Cloze Passage), Sentence Correction (Error Correction), Sentence Completion (Fill in the blanks), Sentence Re-arrangements (Para Jumbles) (Narrative Sequencing), Direct and Indirect Speech, Active Passive Voice (Voice), Verbal Analogy (Word Based Analogy), Articles, Preposition, Conjunction, Sentence Construction, English Writing Ability, Communication Assessment
- Quantitative Aptitude: Ratio and Proportion (Ratios), Divisibility Rules, Data Interpretation, Mixture and Alligation, Permutation and Combination, Logarithm, Number System, HCF LCM, Speed Time and Distance, Percentage, Average, Powers and Exponents (Surds and Indices), Time and Work, Mensuration and Geometry, Age Problems, Pipe and Cistern, Probability, Profit and Loss, Simple Interest and Compound Interest, Algebra
- Analytical and Logical Reasoning: Series (Number and Letter Series) (Numerical Relations and Reasoning), Coding Decoding, Data Sufficiency, Non Verbal Reasoning (Spatial Aptitude) (Spatial Reasoning) (Visual Reasoning), Directions (Direction Test), Ranking, Order and Sequence, Deductive and Inductive Reasoning (Logical Deduction and Induction) (Prepositional Reasoning), Selection Decision Table (Decision Making), Logical Sequence Of Words, Puzzle Solving (Puzzles), Syllogisms, Seating Arrangements, Calendar, Clock, Blood Relations, Cubes & Dices, Venn Diagram, Analytical Reasoning (Counting Figures Reasoning)
- Cognizant Gaming Aptitude: Gamified / Game Based Aptitude
- Java (Cluster 1): Java
- ANSI SQL MySQL (Cluster 1,2,3): SQL
- HTML, CSS, JavaScript (Cluster 1,3): HTML, CSS, JavaScript
- Python (Cluster 2): Python for Placements by Yash Sir
- Cloud Fundamentals (Cluster 2): Emerging Tech Trends
- C# (Cluster 3): C#
- OOPs: Object Oriented Programming (OOPS)
- Technical Assessment (Coding): Coding Questions by Yash Sir, C Programming by Yash Sir, Programming in C++, Pseudo Codes
- Data Structures: Introduction to DS, Array, Stack, Queue, Linked List, Tree, Graphs, Hashing
- DBMS: Basics of DBMS, ER Diagram, Relational Model & Functional Dependencies, Keys & Integrity Constraints, Normalization (1NF - BCNF), Decomposition Properties & 4NF, File Organization & Indexing, Relational Algebra, Relational Calculus, Transaction Management, Concurrency Control, Database Recovery, ORDBMS, Database Security & Authorization, Query Processing & Optimization, Enhanced Data Models, Data Warehousing & Mining, Big Data Systems, NoSQL
- Operating Systems: Introduction to OS, Process Management, CPU Scheduling, Process Synchronization, Deadlock, Threads & Process Creation, Memory Management, Virtual Memory, Disc Scheduling, File Management, Windows OS, Linux OS, Security, Distributed Systems, Virtual Machines
- Computer Networks: Introduction to CN, Data Communication, DLL: Access Control, DLL: Flow Control, DLL: Error Control, DLL: Framing, Data Link Layer - Ethernet, Net Layer: IPv4 & Proto, Net Layer: IP Addressing, Net Layer:Routing Protocol, Transport Layer Services, TL: Congestion & UDP, Application Layer, Hardware basics, Network Security, Cloud Computing and IoT, Cyber and Info Security
AI summary & chapters
AI Summary
An AI-generated summary of this video lecture.
This lecture introduces the Stop-and-Wait Protocol as a fundamental flow control mechanism in data communication. The instructor begins by establishing the problem of receiver overload, explaining that if frames arrive faster than they can be processed, storage becomes an issue. The core definition is presented: the sender transmits a single frame and then stops, waiting for an acknowledgment (ACK) from the receiver before proceeding. A timing diagram visually demonstrates this sequential exchange between Sender A and Receiver B, showing blue Frame blocks followed by orange ACK blocks. The instructor highlights the unidirectional nature of data transmission versus the auxiliary role of ACK tokens, emphasizing that this protocol effectively prevents buffer overflow by forcing the sender to slow down until confirmation is received.
Chapters
0:00 – 2:00 00:00-02:00
The lecture opens with the title "Stop-and-Wait Protocol" displayed on a whiteboard alongside numbered text points. The instructor explains the necessity of flow control, noting that if data frames arrive at the receiver site faster than they can be processed, storage is required. Visible text states that normally receivers do not have enough space to store these frames. To prevent the receiver from becoming overwhelmed, a mechanism is needed to tell the sender to slow down. The instructor defines the protocol explicitly: "The sender sends one frame, stops until it receives confirmation from the receiver... and then sends the next frame." A diagram begins to appear illustrating the sequence of Frames and ACKs traveling between Sender A and Receiver B over time, with the instructor gesturing towards the text to highlight specific steps.
2:00 – 3:22 02:00-03:22
The instructor elaborates on the timing diagram, which depicts Sender A and Receiver B exchanging blue "Frame" blocks and orange "ACK" blocks. Handwritten annotations like "RTT" appear on the timeline at the bottom of the diagram to indicate Round Trip Time. The visual aid emphasizes that while data frames are unidirectional, auxiliary ACK frames act as simple tokens of acknowledgment. The instructor gestures towards the sequence diagram to reinforce that the sender must wait for confirmation before transmitting subsequent data. This section solidifies the concept that flow control is achieved by stopping transmission after each frame until an acknowledgment confirms successful receipt, ensuring the receiver is not overwhelmed.
The Stop-and-Wait Protocol serves as a basic flow control method where the sender transmits one frame and waits for an acknowledgment before sending the next. This approach addresses the issue of receiver buffer overflow by ensuring that frames are not sent faster than they can be processed. The timing diagram clearly shows the alternating sequence of Frames and ACKs, with annotations like RTT indicating the time taken for a round trip. The protocol relies on unidirectional data flow supplemented by auxiliary ACK tokens, creating a simple yet effective mechanism for managing communication speed between Sender A and Receiver B.

