Basics of Flow Control in Data Link Layer

Duration: 7 min

This video lesson is available to enrolled students.

Return to /learn/COGNIZANT-PREPARATION/computer-networks/dll-flow-control/basics-delay-analysis/asset-basics-of-flow-control-in-data-link-layer after enrolling

Inside: a video lesson and guided study material.

Module outline

  1. Communication Round: Vocabulary, Subject Verb Agreement (Verb Noun Agreement), Tenses, Comprehension / Reading Comprehension / Unseen Passages (Critical Reasoning) (Paragraph Questions), Cloze Test (Cloze Passage), Sentence Correction (Error Correction), Sentence Completion (Fill in the blanks), Sentence Re-arrangements (Para Jumbles) (Narrative Sequencing), Direct and Indirect Speech, Active Passive Voice (Voice), Verbal Analogy (Word Based Analogy), Articles, Preposition, Conjunction, Sentence Construction, English Writing Ability, Communication Assessment
  2. Quantitative Aptitude: Ratio and Proportion (Ratios), Divisibility Rules, Data Interpretation, Mixture and Alligation, Permutation and Combination, Logarithm, Number System, HCF LCM, Speed Time and Distance, Percentage, Average, Powers and Exponents (Surds and Indices), Time and Work, Mensuration and Geometry, Age Problems, Pipe and Cistern, Probability, Profit and Loss, Simple Interest and Compound Interest, Algebra
  3. Analytical and Logical Reasoning: Series (Number and Letter Series) (Numerical Relations and Reasoning), Coding Decoding, Data Sufficiency, Non Verbal Reasoning (Spatial Aptitude) (Spatial Reasoning) (Visual Reasoning), Directions (Direction Test), Ranking, Order and Sequence, Deductive and Inductive Reasoning (Logical Deduction and Induction) (Prepositional Reasoning), Selection Decision Table (Decision Making), Logical Sequence Of Words, Puzzle Solving (Puzzles), Syllogisms, Seating Arrangements, Calendar, Clock, Blood Relations, Cubes & Dices, Venn Diagram, Analytical Reasoning (Counting Figures Reasoning)
  4. Cognizant Gaming Aptitude: Gamified / Game Based Aptitude
  5. Java (Cluster 1): Java
  6. ANSI SQL MySQL (Cluster 1,2,3): SQL
  7. HTML, CSS, JavaScript (Cluster 1,3): HTML, CSS, JavaScript
  8. Python (Cluster 2): Python for Placements by Yash Sir
  9. Cloud Fundamentals (Cluster 2): Emerging Tech Trends
  10. C# (Cluster 3): C#
  11. OOPs: Object Oriented Programming (OOPS)
  12. Technical Assessment (Coding): Coding Questions by Yash Sir, C Programming by Yash Sir, Programming in C++, Pseudo Codes
  13. Data Structures: Introduction to DS, Array, Stack, Queue, Linked List, Tree, Graphs, Hashing
  14. DBMS: Basics of DBMS, ER Diagram, Relational Model & Functional Dependencies, Keys & Integrity Constraints, Normalization (1NF - BCNF), Decomposition Properties & 4NF, File Organization & Indexing, Relational Algebra, Relational Calculus, Transaction Management, Concurrency Control, Database Recovery, ORDBMS, Database Security & Authorization, Query Processing & Optimization, Enhanced Data Models, Data Warehousing & Mining, Big Data Systems, NoSQL
  15. Operating Systems: Introduction to OS, Process Management, CPU Scheduling, Process Synchronization, Deadlock, Threads & Process Creation, Memory Management, Virtual Memory, Disc Scheduling, File Management, Windows OS, Linux OS, Security, Distributed Systems, Virtual Machines
  16. Computer Networks: Introduction to CN, Data Communication, DLL: Access Control, DLL: Flow Control, DLL: Error Control, DLL: Framing, Data Link Layer - Ethernet, Net Layer: IPv4 & Proto, Net Layer: IP Addressing, Net Layer:Routing Protocol, Transport Layer Services, TL: Congestion & UDP, Application Layer, Hardware basics, Network Security, Cloud Computing and IoT, Cyber and Info Security
AI summary & chapters

AI Summary

An AI-generated summary of this video lecture.

This lecture introduces flow and error control mechanisms within the Data Link Layer of computer networks. The instructor begins by defining flow control as a method to prevent overwhelming the receiver, utilizing memory buffers for temporary data storage. Key concepts include the necessity of checking incoming data before processing and the requirement for receivers to signal senders to halt transmission when buffers fill. The lesson transitions to error control, defined as the detection and retransmission of lost or corrupt frames. The instructor introduces Automatic Repeat Request (ARQ) as the primary implementation method, classifying protocols based on channel types: noiseless channels utilize simple methods like Stop-and-Wait, while noisy channels require complex protocols such as Go-Back-N and Selective Repeat. Visual aids include whiteboard diagrams of devices A and B, buffer filling illustrations with cross-hatching, and hierarchical classifications of ARQ protocols.

Chapters

  1. 0:00 – 2:00 00:00-02:00

    The instructor introduces flow control concepts using a slide titled "FLOW AND ERROR CONTROL" which lists four numbered points. Point 1 states data flow must not overwhelm the receiver, while Point 2 highlights buffer usage for storing incoming data. The instructor draws a diagram with two boxes labeled "A" and "B" connected by a line to illustrate sender-receiver communication. Text on screen emphasizes that receiving devices have limited processing speeds and memory buffers, requiring them to inform the sender before limits are reached.

  2. 2:00 – 5:00 02:00-05:00

    The lecture transitions to error control mechanisms, defining it as detection and retransmission of lost or corrupt frames. The instructor uses a whiteboard to draw diagrams connecting devices A and B, illustrating buffering scenarios where cross-hatching demonstrates buffer filling when data arrives faster than processing speed. Visible text outlines that flow control prevents receiver overwhelm by storing data until processed. The lesson introduces Automatic Repeat Request (ARQ) as a simple implementation where damaged frames trigger retransmission, marking the shift from flow management to error handling.

  3. 5:00 – 7:18 05:00-07:18

    The instructor explains error control protocols, specifically focusing on Automatic Repeat Request (ARQ) classifications. A hierarchical diagram classifies protocols for noiseless versus noisy channels, with the instructor using gestures to distinguish between these types. Specific ARQ protocols listed include Stop-and-Wait for noiseless channels, described as the simplest method, and Go-Back-N and Selective Repeat for noisy environments. Text on screen defines error control as both detection and correction, though the data link layer primarily focuses on retransmission methods.

The lecture systematically progresses from flow control to error control within the Data Link Layer. Flow control is established as a buffer management technique where receivers signal senders to halt transmission when memory limits approach, preventing data loss due to processing speed mismatches. Error control is then introduced as a mechanism for handling lost or corrupt frames through detection and retransmission. The instructor categorizes ARQ protocols into those suitable for noiseless channels, such as Stop-and-Wait, and those designed for noisy environments like Go-Back-N and Selective Repeat. This progression highlights the layered approach to ensuring reliable data transmission, starting with rate matching and advancing to integrity verification.

Loading lesson…